Laserfiche WebLink
1= 114 :111 JJ 11, I_1 :YI <br />E3 <br />PROJECT TITLE: WPCP Rehabilitation Project <br />PROJECT NO.: 08- 893-62 -239 <br />BID NO.: 10- 11,017 <br />This document is a summary of bids received for the subject project and are provided oni <br />as a convenience. Listing of a particular bid is not a finding that such bid has been found <br />to be responsive or accepted as complete by the City. An award of contract, if any, is <br />subject to approval of the City Council and/or the City Manager. Contractors should refe <br />to the contract documents for bidding information. <br />" "As was disclosed at the beginning of the bid opening, the funding amount for this project is $45,000,000 <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />SJ Amoroso Construction Co., Inc, <br />OSE Construction Company, Inc, <br />WM Lyles Co. <br />DATE: Wedneday, April 12,2D11 <br />Date Approved: 3/16/2011 <br />390 Bridge Parkway <br />8950 Preston Avenue <br />P. 0. Box 4377 <br />TIME: 3:00 PM <br />Prepared by: KC <br />Redwood Shores, CA 94085 <br />Livermore, CA 94551 <br />Fresno, CA 93744 <br />LOCATION: City Clerk <br />Phone: 650 -654 -1900 <br />Phone: 925 -447 -0292 <br />Phone: 559- 441 -1900 <br />Fax: 650-664 -9002 <br />Fax: 925-447-0962 <br />Fax: 559-487-7949 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />BASE BID: <br />1 <br />1 LS <br />Sheeting, shoring, and bracing <br />$1,000,000.00 <br />$1,000,000,00 <br />$1,180,000.00 <br />$1,160,000.00 <br />$840,000.00 <br />$840,000.00 <br />$1,000,000.00 <br />$1,000,000.00 <br />of all excavations <br />2 <br />1 LS <br />Preparation and submittal of a <br />$60,000.00 <br />$60,000.00 <br />$40,000.00 <br />$40,000.00 <br />$30,000.00 <br />$30,000.00 <br />$10,000.00 <br />$10,000.00 <br />written geoteohnical report as <br />specified in Section 02260 <br />3 <br />1 LS <br />Preparation and submittal of <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />record drawings as specified in <br />Section 01720 <br />4 <br />1 LS <br />Certified Payroll as specified in <br />$36,000.00 <br />$36,000.00 <br />$30,000.00 <br />$30,000.00 <br />$5,000.00 <br />$5,000.00 <br />$40,000.00 <br />$40,000.00 <br />Section 000700 -7.2.k <br />5 <br />1 LS <br />Preparation and subittal of <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$160,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />$150,000.00 <br />schedules specified in Section <br />01324 <br />6 <br />1 LS <br />All work required by the plans <br />$43,111,000.00 <br />$43,111,000.00 <br />$33,697,000.00 <br />$33,897,000.00 <br />$35,435,000.00 <br />$35,435,000.00 <br />$36,425,000.00 <br />$36,425,000.00 <br />and specifications except that <br />included in Bid Item Nos. 1 to 5 <br />and Bid Alternative A <br />TOTAL BASE BID: $44,497,000.00 <br />$35,227,000.00 <br />$36,810,000.00 <br />$37,775,000.00 <br />BID ALTERNATE NO. 1 <br />28 <br />1 LS <br />Administration Control Building <br />$4,056,000.00 <br />$4,056,000.00 <br />$4,900,000,00 <br />$4, 900, 000.00 <br />$4,253,000.00 <br />$4,263,000,00 <br />$65,000,000.00 <br />$6,500,000.00 <br />Expansion <br />1 <br />Bid Summary with Alternates -WPCP Rehab Project.xis Page 1 of 6 Printed 4/1512011 a 9:54 AM <br />