Laserfiche WebLink
BID SUMMARY <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />SJ Amoroso Construction Co., Inc. <br />GSE Construction Company, Inc. <br />WM Lyles Co. <br />DATE: Wedneday, April 12, 2011 <br />Date Approved: 3/1512011 <br />390 Bridge Parkway <br />6950 Preston Avenue <br />P. 0. Box 4377 <br />TIME: 3:00 PM <br />Prepared by: KC <br />Redwood Shores, CA 94065 <br />Livermore, CA 94551 <br />Fresno, CA 93744 <br />LOCATION: City Clerk <br />Phone. 650.654 -1900 <br />Phone: 925- 447 -0292 <br />Phone: 559 -441 -1900 <br />Fax: 650 -654 -9002 <br />Fax: 925. 447.0962 <br />Fax: 559467 -7949 <br />ITEM <br />NO. <br />QUANTITY ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />I ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />I ITEM COST <br />TOTAL BASE BID; $44,497,006.00 <br />$38,227,000.00 <br />$36,610,000.00 <br />$37,775,000.00 <br />TOTAL BID ALTERNATE NO. 1: <br />$4,056,000.00 <br />$4,900,000.00 <br />$4,263,000.00 <br />$6,500,000.00 <br />TOTAL BID: $48,553,000.00 <br />$40,127,000.00 <br />$40,863,000.00 <br />$44,275,000.00 <br />SUBCONTRACTORS: <br />RC KneW, Inc,, RGW Construction, <br />Forma Corp, Hillside Drilling Co., <br />Stainy Elect., Redwood, Harris <br />Stroer & Graf, Inc., Malcolm Drilling <br />Inc., Harms Salinas Rebar, Crete <br />Salinas, J.H. Fitzmaurice, Forma <br />Co., Inc., Peck & Hiller Structural <br />Cell Comp, Temoor Conservatek, <br />Corp., RMT, OC Jones, Malcolm <br />Concrete, Harris Salinas Reber, Inc., <br />International Lining Tech, Redwood <br />Drilling, A.J. Diani, <br />Pacific Bay Masonry, Inc., Universal <br />Paining, Universal Coatings, Blocka <br />Coatings, Ina, Hansen Painting & <br />Construction, O'Grady Paving, <br />Decorating, Inc., F.D. Thomas, Inc., <br />Malcolm Drilling, Pangilly Massonry, <br />F. Connolly Electrical Contractors, <br />Inc., Titan Electrical <br />Dowdle & Sons Mechanical, Inc., <br />Kevin Sullivan Heating & Air, Inc. <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />10% Bid Bond <br />NOTES: I <br />I" <br />Math Error Corrected <br />i <br />Reviewed by C� �-� Date: 41 / l/ It <br />'Kevip n, Project Manager <br />Reviewed by: Date: rtY 1 <br />41f Osakwe, Senior Engineer <br />Bid Summery with Attemates -WPCP Rehab ProlectAs Page 2 of 6 Printed 4/15/2011 4p 9:54 AM <br />