My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Joint Highlights 2006 0724
CityHall
>
City Clerk
>
City Council
>
Committees
>
Airport Committee
>
Airport Joint Highlights 2006 0724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2011 3:00:59 PM
Creation date
7/1/2011 3:00:59 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
7/24/2006
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PPP <br /> • • <br /> 1. Runway 27L ILS / MALSR Project Status <br /> The Runway 27 ILS /MALSR Project is in the initial phase of the Environmental <br /> Assessment (EA). The EA schedule is provided below. This schedule shows the <br /> anticipated timeframes for selected EA milestones on the 27L ILS / MALSR project. <br /> The FAA's engineering design contractor has initiated work on the ILS portion of the <br /> system and preliminary draft plans are expected in approximately 2 months time. <br /> (Although a conceptual layout was previously prepared, these are much more detailed <br /> • plans that will lead to the 100% design drawings for the project). The FAA will be <br /> sending out scoping letters for the Environmental Assessment next week to various <br /> federal, state, and local agencies and jurisdictions. The FAA's consultant has received <br /> all the data necessary to begin the noise modeling analysis and these efforts should <br /> begin next week as well. The FAA recently met with the City of Oakland Parks and <br /> Recreation Department and Metropolitan Golf Links staff to discuss citing issues with the <br /> MALSR stations on golf course property. The FAA also met with the City of Alameda <br /> Planning and Building Dept. to identify any permit approval issues for the localizer <br /> antenna site since that location (while on airport land) falls within the City's jurisdiction. <br /> • <br /> Environmental Assessment Schedule - Oakland 27L ILS / MALSR <br /> 2006 <br /> Oakland 27L ILS / MALSR Mar. Apr. May June July Aug. Sep. Oct. Nov. <br /> Kick Off Meeting / Survey Work " <br /> • <br /> Develop & Coordinate Noise Assumptions ' �•' ^- <br /> Send Out Agency Scoping Letters • OM <br /> Develop Project Description for EA Analysis <br /> .1 <br /> Preparation of Preliminary Draft EA <br /> Internal Review of Preliminary Draft EA .1 <br /> Make Revisions and Prepare Draft EA <br /> Distribution of Draft EA - 30 day review y 054: <br /> Public Meeting 1 1 Je <br /> Response to Comments / Prepare Final EA 1 , . <br /> Distribute 8 Publish Final EA / FONSI / ROD <br />
The URL can be used to link to this page
Your browser does not support the video tag.