Laserfiche WebLink
• <br /> • <br /> The Port is also committed to public transportation and high - occupancy vehicle access to OAK. For <br /> example, the Port has already invested $2.5 million in planning and preliminary engineering and is <br /> planning to commit over $25 million to the construction of the on- Airport portions of the BART <br /> Connector, which is a BART project that would construct a people mover to link the Coliseum BART <br /> station and the terminals at OAK. We have shown the BART Connector on the 2025 land -use map. <br /> Further, OAK has convenient curbside access to public transportation and high - occupancy vehicles <br /> modes, such as AC Transit, other scheduled buses, and door -to -door vans. The Port is spending over $90 <br /> million to reconstruct the loop roadway and curbsides to keep OAK convenient for all ground access <br /> modes. <br /> • <br /> Thank you for taking the time to provide detailed input on the draft land -use maps discussed at the <br /> August 11, 2005, Stakeholder Advisory Committee meeting. Your input has been valuable and had a true <br /> impact on the conclusions and recommendations in the master plan. We look forward to bringing the <br /> master plan process to a close and continuing to work with the City of San Leandro and other <br /> communities as projects are further evaluated and potentially implemented. <br /> Sincerely, <br /> Kristi McKenney <br /> Aviation Planning and Development Manger <br /> • <br /> cc: Douglas Mansel <br /> San Leandro Unified School District (USD) Representatives to the Master Plan Stakeholder <br /> Advisory Committee: <br /> Mr. Leon Glaster Mr. Mike Murphy Ms. Heidi Finberg <br /> San Leandro USD San Leandro USD 262 Davis Street <br /> 14735 Juniper Street. 14735 Juniper Street San Leandro, CA 94577 <br /> San Leandro, CA 94579 San Leandro, CA 94579 <br /> Mr. Francois Gallo <br /> 979 Woodland Avenue <br /> San Leandro, CA 94577 <br /> • <br /> • <br /> • <br /> 4 <br />