My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Highlights 2003 1104
CityHall
>
City Clerk
>
City Council
>
Committees
>
Airport Committee
>
Airport Highlights 2003 1104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2011 3:52:08 PM
Creation date
7/1/2011 3:52:07 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
11/4/2003
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • City of San Leandro • <br /> Residential Airport Noise Insulation Program <br /> Project Scope of Work <br /> (Phase I & II) <br /> X PHASE I & [I FIELD DATA COLLECTION PROCESS <br /> A Schedule Architectural Surveys of Remaining 190 Homes <br /> B Conduct Architectural Surveys of Remaining 190 Homes <br /> C Schedule Pre- Construction Noise Monitoring for 5% of Remaining 190 Homes <br /> D Conduct Pre- Construction Noise Monitoring for 5% of Remaining 190 Homes <br /> XI PHASE 1 & II PLANS AND SPECIFICATIONS DEVELOPMENT PROCESS <br /> A Architectural Development of Plans (190 Homes) <br /> B Schedule HazMat Sampling (Asbestos and Lead Based Paint) As Needed <br /> C Conduct HazMat Sampling (Asbestos and Lead Based Paint) As Needed <br /> D Schedule Homeowner Plan Review and Notary Signing Appointments (190 Homes) <br /> E Conduct Homeowner Plan Review and Notary Signing Appointments (190 Homes) <br /> F Final Edit of Architectural Plans (190 Homes) <br /> G Development of Cost Estimate <br /> H Obtain City Approval of Final Plans and Specifications <br /> XH PHASE I BID PROCESS AND CONTRACTOR SELECTION <br /> A Prepare Final Bid Packages <br /> B Step 1 of Bid Process - Contractor Pre- Qualification <br /> C Qualification Analysis of Step 1 Contractor Submissions <br /> D Step 2 of Bid Process - Advertise for Bids <br /> E Schedule and Conduct a Pre-Bid Conference and Site Tour <br /> F Bid Open <br /> G Bid Analysis <br /> H The Lowest Qualified Contractor is Announced <br /> I CKSA Submits a Recommendation to the City for Award of a Contract <br /> J City Approves Award of a Contract <br /> K A Notice of Award is Issued to the City Approved Contractor <br /> L The Construction Contract is Executed <br /> XHI PHASE II BID PROCESS AND CONTRACTOR SELECTION <br /> A Prepare Final Bid Packages <br /> B Step 1 of Bid Process - Contractor Pre- Qualification <br /> C Qualification Analysis of Step 1 Contractor Submissions <br /> D Step 2 of Bid Process - Advertise for Bids <br /> E Schedule and Conduct a Pre-Bid Conference and Site Tour <br /> F Bid Open <br /> G Bid Analysis <br /> H The Lowest Qualified Contractor is Announced <br /> I CKSA Submits a Recommendation to the City for Award of a Contract <br /> J City Approves Award of a Contract <br /> K A Notice of Award is Issued to the City Approved Contractor <br /> L The Construction Contract is Executed <br /> XIV PHASE 1 PRE - CONSTRUCTION PROCESS <br /> A Prepare and Conduct a Pre- Construction Conference <br /> B Contractor Submits Construction Schedule, Product Cut Sheets and Other Submittals <br /> C Review and Approval of Contractor Submittals <br /> D Prepare and Issue a Notice to Proceed to the Contractor <br /> E Schedule Contractor Measurement Verifications <br /> F Contractor Conducts Measurement Verifications <br /> G Contractor Orders Materials <br /> H Material Manufacturer Lead -Time <br /> l Schedule and Conduct a Warehouse Materials Inspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.