BID SUMMARY
<br />BID OPENING
<br />DATE: Thursday, June 2, 2077
<br />TIME: 3:00 PM
<br />LOCATION: City Clerk
<br />ENGINEER'S ESTIMATE
<br />Date Approved:
<br />Prepared by: KL
<br />Redgwick Construction Co.
<br />8150 Enterprise Drive
<br />Newark, CA 94560
<br />Phone: 510 - 792 -1727
<br />Fax: 510- 792 -1728
<br />Gallagher & Burk, Inc.
<br />344 High Street
<br />Oakland, CA 94601
<br />Phone: 510- 261 -0466
<br />Fax: 510 -261 -0478
<br />Top Grade Construction, Inc.
<br />50 Contractors Street
<br />Livermore, CA 94551
<br />Phone: 925- 449 -5764
<br />Fax: 925 -449 -5875
<br />ITEM
<br />NO.
<br />QUANTITY
<br />ITEM
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />ITEM COST
<br />UNIT COST
<br />I ITEM COST
<br />UNIT COST
<br />I ITEM COST
<br />11
<br />6 EA
<br />Adjust Gas Valve Frame &
<br />$800.00
<br />$4,800.00
<br />$250.00
<br />$1,500.00
<br />$500.00
<br />$3,000.00
<br />$450.00
<br />$2,700.00
<br />Cover to Grade
<br />12
<br />1 EA
<br />Adjust Monitoring Well Frame &
<br />$700.00
<br />$700.00
<br />$250.00
<br />$250.00
<br />$500.00
<br />$500.00
<br />$450.00
<br />$450.00
<br />Cover to Grade
<br />13
<br />4,460 TN
<br />Asphalt Concrete Paving
<br />$89.00
<br />$396,940.00
<br />$80.00
<br />$356,800.00
<br />$78.00
<br />$347,880.06
<br />$70.00
<br />$312,200.00
<br />14
<br />14,251 SY
<br />Pavement Reinforcement Mesh
<br />$6.00
<br />$85,506.00
<br />$6.00
<br />$85,506.00
<br />$5.00
<br />$71,255.00
<br />$7.00
<br />$99,757.00
<br />15
<br />40,569 SF
<br />Soil Stabilization Full -Depth
<br />$0.50
<br />$20,284.50
<br />$0.55
<br />$22,312.95
<br />$1.00
<br />$40,569.00
<br />$1.00
<br />$40,569.00
<br />Rehab Method (Equipment &
<br />Labor Only) (S)
<br />16
<br />700 SF
<br />Soil Stabilization at Locations
<br />$1.05
<br />$735.00
<br />$2.50
<br />$1,750.00
<br />$8.00
<br />$5,600.00
<br />$1.00
<br />$700.00
<br />with Utilities Within Stabilized
<br />Base Section (Equipment &
<br />Labor Only) (S)
<br />17
<br />122 TN
<br />Cement Needed for Full -Depth
<br />$110.00
<br />$13,420.00
<br />$130.00
<br />$15,860.00
<br />$100.00
<br />$12,200.00
<br />$130.00
<br />$15,860.00
<br />Rehab (S)
<br />18
<br />1,020 SY
<br />Fog Sealing
<br />$2.50
<br />$2,550.00
<br />$1.00
<br />$1,020.00
<br />$1.00
<br />$1,020.00
<br />$1.00
<br />$1,020.00
<br />19
<br />16 EA
<br />Install Traffic Detector Loops
<br />$400.00
<br />$6,400.00
<br />$375.60
<br />$6,000.00
<br />$400.00
<br />$6,400.00
<br />$650.00
<br />$10,400.00
<br />20
<br />8 EA
<br />Install Redflex Traffic Detector
<br />$400.00
<br />$3,200.00
<br />$375.00
<br />$3,000.00
<br />$400.00
<br />$3,200.00
<br />$750.00
<br />$6,000.00
<br />Loops
<br />21
<br />4 EA
<br />Install Traffic Detector Wells
<br />$300.00
<br />$1,200.00
<br />$900.00
<br />$3,600.00
<br />$400.00
<br />$1,600.00
<br />$800.00
<br />$3,200.00
<br />22
<br />1 LS
<br />Install Video Imaging Vehicle
<br />$21,000.00
<br />$21,000.00
<br />$50,000.00
<br />$50,000.00
<br />$30,000.00
<br />$30,000.00
<br />$55,000.00
<br />$55,000.00
<br />Detection System at
<br />Marinaffeagarden Intersection
<br />23
<br />1 LS
<br />Install Video Imaging Vehicle
<br />$20,500.00
<br />$20,500.00
<br />$25,000.00
<br />$25,000.00
<br />$30,000.00
<br />$30,000.00
<br />$26,000.00
<br />$26,000.00
<br />Detection System at
<br />Marina /Alvarado Intersection
<br />24
<br />1 LS
<br />Remove and Replace
<br />$18,000.00
<br />$18,000.00
<br />$15,000.00
<br />$15,000.00
<br />$10,000.00
<br />$10,000.00
<br />$26,000.00
<br />$26,000.00
<br />Thermoplastic Stripes,
<br />Pavement Markings and
<br />Markers
<br />25
<br />2,270 SF
<br />Install Curb Ramp wl Truncated
<br />$16.50
<br />$37,455.00
<br />$20.00
<br />$45,400.00
<br />$16.00
<br />$36,320.00
<br />$19.00
<br />$43,130.00
<br />Domes Per City Std Plan No.
<br />106A and 106E
<br />Bid Summary- Marina Blvd Street Rehabililation.xls Page 2 of 10 Printed 718!2011 @ 111:48 AM
<br />
|