Laserfiche WebLink
BID SUMMARY <br />BID OPENING <br />DATE: Thursday, June 2, 2077 <br />TIME: 3:00 PM <br />LOCATION: City Clerk <br />ENGINEER'S ESTIMATE <br />Date Approved: <br />Prepared by: KL <br />Redgwick Construction Co. <br />8150 Enterprise Drive <br />Newark, CA 94560 <br />Phone: 510 - 792 -1727 <br />Fax: 510- 792 -1728 <br />Gallagher & Burk, Inc. <br />344 High Street <br />Oakland, CA 94601 <br />Phone: 510- 261 -0466 <br />Fax: 510 -261 -0478 <br />Top Grade Construction, Inc. <br />50 Contractors Street <br />Livermore, CA 94551 <br />Phone: 925- 449 -5764 <br />Fax: 925 -449 -5875 <br />ITEM <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />I ITEM COST <br />UNIT COST <br />I ITEM COST <br />11 <br />6 EA <br />Adjust Gas Valve Frame & <br />$800.00 <br />$4,800.00 <br />$250.00 <br />$1,500.00 <br />$500.00 <br />$3,000.00 <br />$450.00 <br />$2,700.00 <br />Cover to Grade <br />12 <br />1 EA <br />Adjust Monitoring Well Frame & <br />$700.00 <br />$700.00 <br />$250.00 <br />$250.00 <br />$500.00 <br />$500.00 <br />$450.00 <br />$450.00 <br />Cover to Grade <br />13 <br />4,460 TN <br />Asphalt Concrete Paving <br />$89.00 <br />$396,940.00 <br />$80.00 <br />$356,800.00 <br />$78.00 <br />$347,880.06 <br />$70.00 <br />$312,200.00 <br />14 <br />14,251 SY <br />Pavement Reinforcement Mesh <br />$6.00 <br />$85,506.00 <br />$6.00 <br />$85,506.00 <br />$5.00 <br />$71,255.00 <br />$7.00 <br />$99,757.00 <br />15 <br />40,569 SF <br />Soil Stabilization Full -Depth <br />$0.50 <br />$20,284.50 <br />$0.55 <br />$22,312.95 <br />$1.00 <br />$40,569.00 <br />$1.00 <br />$40,569.00 <br />Rehab Method (Equipment & <br />Labor Only) (S) <br />16 <br />700 SF <br />Soil Stabilization at Locations <br />$1.05 <br />$735.00 <br />$2.50 <br />$1,750.00 <br />$8.00 <br />$5,600.00 <br />$1.00 <br />$700.00 <br />with Utilities Within Stabilized <br />Base Section (Equipment & <br />Labor Only) (S) <br />17 <br />122 TN <br />Cement Needed for Full -Depth <br />$110.00 <br />$13,420.00 <br />$130.00 <br />$15,860.00 <br />$100.00 <br />$12,200.00 <br />$130.00 <br />$15,860.00 <br />Rehab (S) <br />18 <br />1,020 SY <br />Fog Sealing <br />$2.50 <br />$2,550.00 <br />$1.00 <br />$1,020.00 <br />$1.00 <br />$1,020.00 <br />$1.00 <br />$1,020.00 <br />19 <br />16 EA <br />Install Traffic Detector Loops <br />$400.00 <br />$6,400.00 <br />$375.60 <br />$6,000.00 <br />$400.00 <br />$6,400.00 <br />$650.00 <br />$10,400.00 <br />20 <br />8 EA <br />Install Redflex Traffic Detector <br />$400.00 <br />$3,200.00 <br />$375.00 <br />$3,000.00 <br />$400.00 <br />$3,200.00 <br />$750.00 <br />$6,000.00 <br />Loops <br />21 <br />4 EA <br />Install Traffic Detector Wells <br />$300.00 <br />$1,200.00 <br />$900.00 <br />$3,600.00 <br />$400.00 <br />$1,600.00 <br />$800.00 <br />$3,200.00 <br />22 <br />1 LS <br />Install Video Imaging Vehicle <br />$21,000.00 <br />$21,000.00 <br />$50,000.00 <br />$50,000.00 <br />$30,000.00 <br />$30,000.00 <br />$55,000.00 <br />$55,000.00 <br />Detection System at <br />Marinaffeagarden Intersection <br />23 <br />1 LS <br />Install Video Imaging Vehicle <br />$20,500.00 <br />$20,500.00 <br />$25,000.00 <br />$25,000.00 <br />$30,000.00 <br />$30,000.00 <br />$26,000.00 <br />$26,000.00 <br />Detection System at <br />Marina /Alvarado Intersection <br />24 <br />1 LS <br />Remove and Replace <br />$18,000.00 <br />$18,000.00 <br />$15,000.00 <br />$15,000.00 <br />$10,000.00 <br />$10,000.00 <br />$26,000.00 <br />$26,000.00 <br />Thermoplastic Stripes, <br />Pavement Markings and <br />Markers <br />25 <br />2,270 SF <br />Install Curb Ramp wl Truncated <br />$16.50 <br />$37,455.00 <br />$20.00 <br />$45,400.00 <br />$16.00 <br />$36,320.00 <br />$19.00 <br />$43,130.00 <br />Domes Per City Std Plan No. <br />106A and 106E <br />Bid Summary- Marina Blvd Street Rehabililation.xls Page 2 of 10 Printed 718!2011 @ 111:48 AM <br />