My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2011 0718
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0718
>
8I Consent 2011 0718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2011 5:29:48 PM
Creation date
7/14/2011 3:36:43 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/18/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0718
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0718
Reso 2011-149
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Driveways altered by the construction of non permitted concrete, asphalt, wood, or other <br />unauthorized materials will not qualify under this program, unless the conditions found in the <br />aforementioned paragraph also exist. <br />All residential properties will receive written notice containing details of the upcoming street <br />reconstruction. <br />Property owners will also be advised whether or not the replacement of their driveway <br />qualifies for cost sharing under this program. <br />Property owners will also be informed that following the completion of the street <br />reconstruction work, that use of appurtenances in the street gutter (e.g., wood, concrete, or <br />metal ramps) to adjust for grade differences between the street and driveway will not be <br />allowed in accordance with San Leandro Municipal Code, Section 5 -1 -200. This notification <br />is necessary to minimize the potential for flooding and pavement water damage as a result of <br />gutter blockage. <br />48.5.500: TIME LI_MITS FOR PARTICIPATION. Eligibility for this cost - sharing <br />program is for a limited time. The eligibility period for this program is as follows: <br />(a) Start of Eligibility Period. Twelve (12) months prior to the award of the associated <br />street rehabilitation project construction contract. <br />(b) End of Eligibility Period. Six (6) Three (3) months after the initial acceptance of the <br />associated street rehabilitation project construction contract. <br />a a WAR 011 P" PA ral 61 <br />MOR I UM P Is <br />§8.5.600: SUSPENSION OF PROGRAM. This program may be suspended by the City <br />Manager when insufficient funding is available for its implementation. <br />Page 2 <br />ONOW0 <br />"I <br />48.5.500: TIME LI_MITS FOR PARTICIPATION. Eligibility for this cost - sharing <br />program is for a limited time. The eligibility period for this program is as follows: <br />(a) Start of Eligibility Period. Twelve (12) months prior to the award of the associated <br />street rehabilitation project construction contract. <br />(b) End of Eligibility Period. Six (6) Three (3) months after the initial acceptance of the <br />associated street rehabilitation project construction contract. <br />a a WAR 011 P" PA ral 61 <br />MOR I UM P Is <br />§8.5.600: SUSPENSION OF PROGRAM. This program may be suspended by the City <br />Manager when insufficient funding is available for its implementation. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.