My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2011 0718
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0718
>
8K Consent 2011 0718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:46:18 AM
Creation date
7/14/2011 3:39:28 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/18/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0718
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0718
Reso 2011-145
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: July 18, 2011 <br />TO: Lianne Marshall, Interim City Manager <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />Lianne Marshall <br />Interim City Manager <br />FROM: Uchenna Udemezue, Director <br />Engineering and Transportatio n <br />BY: Keith Cooke, Principal Engine <br />Engineering and Transportation Depart ent <br />SUBJECT PROJECT/PROJECT DESCRIPTION: <br />RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND CALLING FOR <br />BIDS FOR THE AMERICANS WITH DISABILITIES ACT (ADA) RAMP PROJECT <br />2011 -12, PROJECT NO. 2012.0140. <br />SUMMARY AND RECOMMENDATION <br />This project provides for the construction of Americans with Disabilities Act (ADA) <br />compliant sidewalk wheelchair ramps at street intersections throughout the city. <br />Staff recommends approval of the plans and specifications and call for bids for the <br />subject project. <br />BACKGROUND <br />In 1995, the City completed an ADA transition plan that describes the work required to <br />bring the City into compliance with national ADA requirements. The transition plan <br />states that the City will install sidewalk wheelchair ramps at intersections whenever <br />repair is made to the adjacent street or sidewalk. <br />This CDBG- funded project will install ramps from the Priority One list. Priority One <br />ramps are defined as ramps that should have been upgraded to current ADA standards <br />when a significant street repair project was performed adjacent to them during or after <br />1995. <br />Approximately 239 ramps on the Priority One list have been installed using CDBG funds. <br />It is estimated that CDBG funding is available for an additional 25 ramps as part of this <br />project. Additional ramps will be installed at the request of residents and will be funded <br />using Transportation Development Act (TDA) grant funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.