My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent 2011 0718
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0718
>
8M Consent 2011 0718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:46:49 AM
Creation date
7/14/2011 3:40:35 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/18/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0718
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0718
Reso 2011-147
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />BID OPENING <br />ENGINEER'S ESTIMATE <br />Gallagher & Burk, Inc. <br />Ghilolti Construction Co., Inc. <br />DATE: Friday, July 8, 2011 <br />Date Approved: <br />344 High Street <br />246 Ghilotti Avenue <br />TIME:..3:00 PM <br />Prepared by: <br />KKL <br />Oakland, CA 94601 <br />Santa Rosa, CA 95407 <br />LOCATION: City Clerk <br />Phone: 510 - 261 -0466 <br />Phone: 707 - 585 -1221 <br />Phone: <br />Fax: 510 - 261 -0478 <br />Fax: 707 - 585 -1601 <br />Fax: <br />ITEM <br />I <br />NO. <br />QUANTITY <br />ITEM <br />UNIT COST <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />UNIT C-S'T <br />ITEM COST <br />UNIT COST <br />ITEM COST <br />TOTAL BASE BID: <br />$876,948.87 <br />$997,329.50 <br />$1,064,709.00 <br />$0.00 <br />BID ALTERNATE NO. 1 <br />Al <br />31'EA <br />Adjust EBMUD Water Valve Pot <br />$800.00 <br />$24,800.00 <br />$400.00 <br />$12,400.00 <br />$630.00 <br />$19,530.00 <br />$0.00 <br />I <br />to Grade <br />TOTAL BID ALTERNATE NO. 1: <br />$24,800.00 <br />$12,400.00 <br />$19,530.00 <br />$0.00 <br />TOTAL BASE BID: <br />$876,948.87 <br />$997,329.60 <br />$1,064,709.00 <br />$0.00 <br />TOTAL BID ALTERNATE NO. 1: <br />$24,800.00 <br />$12,400.00 <br />$19,630.00 <br />$0.00 <br />TOTAL BID: <br />$901,748.87 <br />$1,009,729.50 <br />$1,084,239.00 <br />$0.00 <br />3 B NTRA TORS: <br />TDW Construction, Inc.. AJW <br />Schotka Const., AJW Construction, <br />XYZ <br />Construction, Striping Graphics, <br />Bayside Stripe & Seal <br />Griffin Soil <br />SECURITIES: <br />10% Bid Bond <br />10% Bid Bond <br />10% Bid Bond <br />NOTES: <br />I <br />j ** Math Error Corrected <br />Reviewed by: <br />KyA ' Pr jest Manager <br />Reviewed by: ' <br />e Osakwe, Senior Engineer <br />Date( <br />Date: <br />Bid Summary - rev.xrsx Page 3 of 3 Printed 7/812011 @ 3:45 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.