My WebLink
|
Help
|
About
|
Sign Out
Home
8N Consent 2011 0718
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0718
>
8N Consent 2011 0718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 9:47:02 AM
Creation date
7/14/2011 3:41:21 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/18/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0718
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0718
Reso 2011-148
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />STAFF REPORT <br />DATE: July 18, 2011 <br />TO: <br />FROM: <br />BY: <br />Lianne Marshall, Interim City Manager <br />Uchenna Udemezue, Director <br />Engineering and Transportation <br />Kenneth Joseph, City Engineer <br />Engineering and Transportation <br />APPROVED AND <br />FORWARDED <br />TO CITY COUNCIL <br />Lianne Marshall <br />Interim City Manager <br />Depa ment <br />SUBJECT PROJECT/PROJECT DESCRIPTION: <br />RESOLUTION OF AWARD OF CONSTRUCTION CONTRACT TO BLOSSOM VALLEY <br />CONSTRUCTION FOR THE PAR COURSE IMPROVEMENTS, PROJECT NO. 10- 150 -38- <br />322. <br />SUMMARY AND RECOMMENDATION <br />This project provides for reconstruction of the asphalt concrete pathways and replacement of the <br />exercise equipment at the Marina Park par course. <br />Staff recommends award of the construction contract to Blossom Valley Construction in the <br />amount $402,776.00 for the subject project. <br />BACKGROUND <br />On March 2, 2009, the City received notice from the East Bay Regional Parks District (EBRPD) <br />of our eligibility for $3,740,998 in Measure WW Park Bond funds. The funds are for the <br />acquisition and development of neighborhood, community, and regional parks and recreation <br />lands and facilities. The City asked citizens for their input on how they would like the money <br />spent and chose to proceed with the top ten projects, and this project is one of these. The poor <br />condition of the asphalt pavement, tripping hazards, and deteriorating par course exercise <br />equipment were noted as features that the community would like to see improved with Measure <br />WW funding. <br />The asphalt at the par course is in a deteriorated condition. Patching is no longer effective and <br />erosion of the path edge has created tripping hazards. The project will reconstruct the asphalt <br />concrete pathways, construct concrete pads for new exercise equipment, and install new benches <br />at intervals along the par course pathway. Some sections of the path will be realigned and re- <br />graded to meet Americans with Disabilities Act (ADA) standards and to take advantage of views <br />of the San Francisco Bay and San Leandro Marina. <br />
The URL can be used to link to this page
Your browser does not support the video tag.