My WebLink
|
Help
|
About
|
Sign Out
Home
8O Consent 2011 0718
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0718
>
8O Consent 2011 0718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2011 10:20:46 AM
Creation date
7/14/2011 3:42:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/18/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0718
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0718
Reso 2011-150
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
required. Addendum required to correct design omissions or deficiencies will be <br />prepared at no additional cost. <br />Other Deliverables: <br />In addition to the above PS &E deliverables, the consultant shall also provide two <br />Powerpoint presentations for City Staff use at public meetings (one at the start <br />of the design and another for pre - construction meeting) and City Council <br />Committee presentations. <br />Consultant shall hire geotechnical and structural sub - consultants as needed to <br />provide design criteria and structural calculations for City of San Leandro <br />building permit. <br />C4.0 PROJECT SCHEDULE <br />CC approval of Consulting Contract <br />July 2011 <br />Notice to Proceed <br />Monthly progress meetings <br />July 2011 — February 2012 <br />Public Meeting / Community Workshop — <br />September 2011 <br />PowerPoint Submittal 1 <br />PS &E Submittal 1 — Design Intent <br />October 2011 <br />Permit Information submittal- <br />October 2011 <br />Caltrans / Bart Encroachment Permits <br />Permit Application submittal - <br />October 2011 <br />EBMUD / PG &E applications <br />PS &E Submittal 2 — Design Review <br />November 2011 <br />PS &E Submittal 3 — Complete `Pre -bid' <br />January 2012 <br />Public Meeting <br />March 2012 <br />PowerPoint Submittal 2 <br />PS &E Submittal 4- `Final Bid PS &E' <br />April 2012 <br />Project pre -bid meeting <br />Project bid assistance. <br />C5.0 PROJECT BUDGET <br />The total project construction budget is $4,950,000. Consultant shall provide estimates <br />for landscape items within their landscape scope and work with the City to bring the <br />project cost within budgeted limits. Up to two `additive alternate' options will be <br />separated out on the final bid documents to allow flexibility to meet budget requirements <br />at time of the project award. <br />Consulting Services Agreement between July 18, 2011 <br />City of San Leandro and Golden Associates -- Exhibit A Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.