Laserfiche WebLink
observation and testing of trenching and backfill in the vicinity of the Area 3 <br /> improvements in the Contract Drawings. <br /> • Foundation construction: Fugro will provide geotechnical services during foundation <br /> construction, including observation of footing excavations and observation of ground <br /> improvement operations (i.e. soil cement columns). <br /> • Laboratory services: Fugro will perform in -house laboratory geotechnical tests in support <br /> of earthwork observation and testing. For this task, Fugro has assumed they will perform <br /> five 6 -inch mold compaction tests for baserock materials (ASTM D1557) and ten <br /> compaction curve checkpoints. <br /> • Office services: Fugro will provide the following office engineering services during <br /> construction: 1) provide limited supplemental engineering and consultations with <br /> Consultant, City, and Contractor as required during the course of construction; 2) respond <br /> to contractor RFIs; 3) evaluate proposed import fill materials; 4) provide technical review <br /> and document quality control; 5) prepare supplemental geotechnical engineering letters <br /> and memoranda to address construction or design issues; 6) provide administrative <br /> technical support for document preparation; and 7) provide a final letter as requested by <br /> the City to confirm the observed construction was completed in general accordance with <br /> the Contract Documents. <br /> • Administration Control Building entry and laboratory: Fugro will provide part-time to <br /> full -time observation of Bay Mud excavation and shoring operations, placement of fill <br /> materials, and trench backfill. Fugro will be onsite to perform field nuclear gauge density <br /> testing of compacted soil and sampling of construction materials such as lightweight <br /> concrete and CLSM backfill. For this scope, Fugro has assume the construction of this <br /> building will not occur until approximately 12 months into the start of construction. <br /> Information Provided by City: <br /> • None. <br /> Consultant Deliverables: <br /> • Responses to RFIs. <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and Carollo Engineers, Inc. Page 22 <br />