CHAPTER 2. DEVELOPMENT OF CAPACITY CHARGES <br />Capacity Charge Unit Costs <br />Capacity charge unit costs for each functional cost category shown in Table 2 -2 are developed <br />using the asset values from Table 2 -1 for each category and dividing them by the capacity of the <br />wastewater system for each category. The development of unit costs is shown schematically in <br />Figure 1 -1. These unit costs may be used to calculate a capacity charge for any new connection. <br />Table 2 -2. Capacity Charge Unit Costs <br />Asset Class <br />2008 <br />2009 <br />2010 <br />2011 <br />2012 <br />2013 <br />2014 <br />Asset Valuation <br />Allocation $ (a) <br />Flow <br />$169,207,500 <br />$174,284,250 <br />$179,512,500 <br />$184,897,500 <br />$190,444,500 <br />$196,158,000 <br />$202,042,500 <br />BOD <br />$27,073,200 <br />$27,885,480 <br />$28,722,000 <br />$29,583,600 <br />$30,471,120 <br />$31,385,280 <br />$32,326,800 <br />SS <br />$29,329,300 <br />$30,209,270 <br />$31,115,500 <br />$32,048,900 <br />$33,010,380 <br />$34,000,720 <br />$35,020,700 <br />Design Capacity (b) <br />Flow, gpd <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />10,600,000 <br />BOD, Ibs /day <br />41,471 <br />41,471 <br />41,471 <br />41,471 <br />41,471 <br />41,471 <br />41,471 <br />SS, Ibs /day <br />39,186 <br />39,186 <br />39,186 <br />39,186 <br />39,186 <br />39,186 <br />39,186 <br />Unit Costs <br />Flow, $ /gpd <br />$15.96 <br />$16.44 <br />$16.94 <br />$17.44 <br />$17.97 <br />$18.51 <br />$19.06 <br />BOD, $ /Ibs /day <br />$652.82 <br />$672.41 <br />$692.58 <br />$713.36 <br />$734.76 <br />$756.80 <br />$779.50 <br />SS, $ /Ibs /day <br />$748.46 <br />$770.92 <br />$794.05 <br />$817.87 <br />$842.40 <br />$867.68 <br />$893.70 <br />Notes: <br />a. Asset allocation values are from Table 2 -1. <br />b. The design capacities for <br />flow, BOD and SS <br />were obtained <br />from <br />Technical Memorandum <br />No. 1 Flow and Loading Evalution <br />dated February <br />2009. <br />Values are Average Day <br />Maximum Month (ADMM) from Table 1. 12, Influent Flow and Loading Projections WPCP Rehabilitation Project. <br />Current, Allowable and Recommended Capacity Charge Unit Costs <br />The capacity charge unit costs shown in Table 2 -2 are those that are allowable based on the <br />selected development methodology. Recommended unit costs are equal to the allowable unit costs <br />in all years. <br />Current and recommended capacity charge unit costs are shown in Table 2 -3. <br />Table 2 -3. Current and Recommended Capacity Charge Unit Costs <br />Actual Recommended <br />Asset Class 2008 2009 2010 2011 2012 2013 2014 <br />Unit Costs (a) <br />Flow, $ /gpd $5.70 $5.87 $16.94 $17.44 $17.97 $18.51 $19.06 <br />BOD, $ /Ibs /day $344.10 $354.80 $692.58 $713.36 $734.76 $756.80 $779.50 <br />SS, $ /Ibs /day $362.67 $373.94 $794.05 $617.87 $842.40 $867.68 $893.70 <br />Notes: <br />a. Capacity charge unit costs are from Table 2 -2. <br />2 -3 <br />