My WebLink
|
Help
|
About
|
Sign Out
Home
8C Consent 2011 0919
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 0919
>
8C Consent 2011 0919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2011 5:14:27 PM
Creation date
9/13/2011 5:44:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
9/19/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 0919
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 0919
Reso 2011-162
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-163
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-164
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-165
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Airport Noise Insulation Approve Amendment 3 September 19, 2011 <br />of Contract and Change Order <br />managing and administering the program, in accordance with the terms and specific <br />provisions of the settlement agreement. The list of preliminary tasks includes: <br />• Provision of technical assistance for the program and participation in meetings <br />with the community, contractors, property owners, tenant, the Port, and the City. <br />• Before initiation of the Residential Sound Insulation Program, prepare a policies <br />and procedures manual in conjunction with City staff. <br />• Develop homeowner educational and informational materials. <br />• Provide contract and construction management services. <br />• Develop overall program schedules and monitor schedules of individual <br />contractors. <br />• Prepare Construction Documents, which include specifications and scopes of <br />work to meet the design criteria of 5 dB improvement in the Noise Level <br />Reduction (NLR) of the home and a post construction interior noise level not to <br />exceed CNEL (Community Noise Equivalent Level) 45 dB. <br />• Prepare program budget. <br />• Estimate construction costs for bid purposes and review bids and follow up with <br />Letters of Recommendation. <br />• Provide appropriate inspections during construction and post - construction for <br />each home or living unit and determine that all work and materials are in <br />conformance with the Construction Documents when construction is complete. <br />• Submit periodic program progress reports, including noise reduction for each <br />home or living unit, work completed and associated costs. <br />• Prepare final acceptance report. <br />Selection Process <br />On June 12, 2003, the selection committee, consisting of representatives from the City, <br />the Port and a West San Leandro community member selected by the City Council <br />Airport Committee, reviewed the responses to the RFQ and interviewed the selected <br />finalists. The committee determined that C. Kell -Smith &Associates was the highest <br />rated proposer and recommended that the City enter into formal negotiations. <br />The following summarizes the scope of services and the process for selection of the Contractor. <br />General Scope of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.