Laserfiche WebLink
EXHIBIT G - EQUIPMENT LOAN AGREEMENT <br />A. INTRODUCTION: <br />Paramedics Plus has contracted with County to loan the following equipment to Contractor for <br />use on FRALS units at no cost to Contractor: <br />1. Seven (7) rugged mobile personal computers and Tablet PC software for the PCR data <br />collection system: <br />a. Panasonic CF -19 Toughbook <br />b. One (1) spare battery <br />c. One (1) AC charging cable <br />d. IT support and updates when required <br />e. Routine scheduled maintenance. <br />2. Seven (7) LIFEPAK 15 System <br />a. LP 15 monitor - defibrillators capable of wireless transmission of 12 -lead ECG's for each <br />unit and sufficient data plan to accommodate and support this process. <br />b. Temporary replacement Lifepak 15s for units undergoing repairs <br />c. Velocitor charger <br />d. Station charger <br />e. One (1) spare battery <br />3. Seven (7) Physio- Control chest compression system (LUCAS device) <br />a. Lucas CPR device <br />b. One (1) spare battery <br />c. One (1) station <br />B. CONDITIONS: <br />1. Acceptance of Paramedics Plus equipment is optional. By accepting equipment under this <br />agreement, Contractor commits to utilizing equipment in the delivery of all ALS First <br />Response services. If Contractor is not utilizing the equipment for the delivery of care (e.g.: <br />closure of a station, reduction of FRALS units) all equipment must be immediately returned <br />to Paramedics Plus. <br />2. Paramedics Plus shall maintain ownership of the equipment at all times. The terms of this <br />exhibit and the responsibilities outlined herein are not transferable. By accepting <br />Paramedics Plus equipment, the Contractor agrees to comply with all terms and conditions <br />set forth herein associated with the loan of equipment. <br />3. The Contractor shall be solely responsible for the proper use and deployment of the <br />equipment. Paramedics Plus shall be responsible for training personnel using the <br />equipment on the proper use of the equipment in accordance with any equipment use <br />procedures. The Contractor accepts sole responsibility for operating the equipment at its <br />sole risk. <br />4. Contractor agrees to give this equipment the same level of care as similar property <br />purchased by Contractor. Equipment shall be returned to Paramedics Plus in as good a <br />