My WebLink
|
Help
|
About
|
Sign Out
Home
10A Action 2011 1017
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1017
>
10A Action 2011 1017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 1:07:46 PM
Creation date
10/12/2011 1:24:20 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
10/17/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1017
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1017
Reso 2011-182
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 11 -243 <br />opportunity to select a partner and take over operations. If SL Dark Fiber abandons the <br />system, the City will take ownership. <br />Dedication of Fiber Strands for City Use - The license requires SL Dark Fiber to dedicate <br />30 strands, or roughly 10 percent of the new fiber system, to the City for its unrestricted use. <br />Analysis: This contribution will be useful to the City for municipal operations (networking, <br />traffic signals, etc.) and potentially for partnering with other entities such as service providers <br />or the schools. The dedicated fibers might also be used as a backbone for a municipal <br />wireless system although additional investment would be required to make such a system <br />operational. Although connection costs could be substantial, this dedication provides the City <br />significant additional fiber optic capacity. <br />Project Costs - SL Dark Fiber has the sole responsibility for all project costs, including all <br />design, development, and construction costs. The City will be responsible for its staff, <br />attorney and consultant time and to conduct any studies including any environmental, <br />marketing, financial feasibility, and design studies it deems necessary to assist with the <br />analysis of the project. <br />Analysis: The City has invested staff and resources to support the project while ensuring that <br />financial risk to the City is minimized. <br />Maintenance - SL Dark Fiber shall have sole responsibility for the installation, operation, <br />maintenance, security, replacement and repair of the SL Dark Fiber network. When damage <br />is caused by a third party, the City and SL Dark Fiber will share the costs of repair and <br />reimbursement proportionally. <br />Analysis: These conditions ensure that SL Dark Fiber funds all costs associated with <br />maintenance of its system and repair of any damage caused as a result of the installation <br />and operation of their system. The City will oversee the maintenance and repair of the <br />system as it has an interest in maintaining control over City conduit space which also <br />contains existing City fiber used for communications and traffic signals. <br />As -Is Conveyance - The City grants the license to SL Dark Fiber for the property in its <br />"as -is" condition, and SL Dark Fiber acknowledges that the City makes no representations or <br />warranties to SL Dark Fiber with regard to the condition of the Property or the fitness or <br />suitability thereof for SL Dark Fiber's purposes. <br />Analysis: SL Dark Fiber is presently undertaking an analysis to determine if sufficient <br />capacity exists within all portions of the City conduit. Where adequate capacity does not <br />exist, the City will work with SL Dark Fiber to the extent possible to identify alternatives. <br />Project Schedule - SL Dark Fiber has submitted a construction schedule that assumes the <br />fiber loop installation will take slightly less than three months. <br />Analysis: The City's consultant believes this schedule is reasonable, assuming no <br />unforeseen hurdles. If issues do arise, a longer construction schedule would not cause any <br />significant negative impacts for the City. <br />City of San Leandro Page 3 Printed on 10/11/2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.