My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2011 Roebbelen Contracting Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2011
>
Agmt 2011 Roebbelen Contracting Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2011 5:55:51 PM
Creation date
10/27/2011 5:55:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/1/2011
Retention
PERM
Document Relationships
Reso 2011-175
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> FURNISH AND INSTALL FENCE AND ROLLING GATE <br /> AT POLICE DEPARTMENT PARKING LOT <br /> Bid No. 11- 12.005 <br /> SCOPE OF WORK/SPECIFICATIONS (continued) <br /> • Provide and install control conduits from Pump Room at PD to gate and gate controller <br /> required to provide for its installation (wiring to be performed by Denalect Alarm under <br /> contract with City) <br /> • All equipment units shall be mounted using Hilti Kwick Boltz or equivalent <br /> • Saw -cut and install all vehicle detector loops and relief cut for the sliding gate ground <br /> track <br /> • Furnish, install and terminate all control wiring <br /> • Bring system up and provide complete operational testing once Denalect has completed <br /> their installations <br /> • Train designated City personnel in the operation and maintenance of the vehicle access <br /> system <br /> . • Work by any sub - consultant for vehicle access controls shall be coordinated with the <br /> fence contractor <br /> • Obtain all necessary building permits (cost for permits to be paid by the City) <br /> • All work must be coordinated in advance with the City Police Captains <br /> • All contractor and subcontractor personnel must wear City- issued IDbadges at all times <br /> • Contractor must follow all instructions from PD for vacating work area(s) as needed <br /> • Total bid price to include all materials, tax, freight, labor and installation <br /> • <br /> • <br /> PLEASE NOTE THAT THE PROPOSED FINAL LOCATION FOR THE FENCE <br /> SHALL BE STAKED IN THE FIELD BY CONTRACTOR AND APPROVED BY <br /> THE CITY PRIOR TO THE INSTALLATION OF FENCE POSTS <br /> . ATTACHED MAP FOR REFERENCE PURPOSES ONLY <br /> • <br /> 11-12.005 PD PARKING LOT FENCE & ROLLING GATE <br /> Page l21 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.