My WebLink
|
Help
|
About
|
Sign Out
Home
3B Public Hearing 2011 1121
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1121
>
3B Public Hearing 2011 1121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2011 2:12:41 PM
Creation date
11/15/2011 5:31:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
11/21/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1121
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1121
8F Consent 2011 1205
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1205
Reso 2011-193
(Amended)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Crow, referring to the nearby Principled Academy, suggested that since the start of the <br />construction may coincide with the times that parents would bring their children to school in the morning, <br />it would be good to let the school know what would be happening. He said that he's spoken with school <br />principal Kristine Scher, who expressed willingness to make accommodations. Indicating that he wants <br />the complex to be a good neighbor, Mr. Brooks replied, "It's we that have to make the accommodations, <br />not her." He also said that his company has built many projects, both single- and multi - family, right <br />across from elementary and middle schools, so his team is pretty adept in those situations. <br />In terms of the CC &Rs, Commissioner Crow reiterated his concern about events in the community <br />building, particularly considering its proximity to the school. Mr. Brooks said that his company has never <br />had a problem with its community buildings. Typically, he explained, the POA would make the rules <br />governing use of the community building, and then assign the responsibility for enforcement over to the <br />manager. With rare exception, he added, the community building is for residents' use. They must show <br />proof of insurance, pay a cleaning deposit and often a rental fee. He also indicated that exceptions might <br />be made for community groups that are looking for a room to hold an event; in those instances, the group <br />isn't charged a fee, but insurance is required. <br />As for the community building's capacity, he said it's only about 20x10 feet, and would accommodate 20 <br />to 30 people. The rental agreement would specify the time of use, and parties would be monitored to <br />ensure noise doesn't become a problem. <br />Given the soft economy, Commissioner Reed asked whether there's a timetable for moving forward with <br />the project. Mr. Brooks said that he doesn't have a very good outlook on the economy right now, and <br />realistically expects it to be more like 10 years than two years. The current market wouldn't support this <br />project, he said. In keeping with that effort, he called attention to the architectural detail and variety that <br />create visual interest while using a long - lasting, easy -to- maintain type of construction to minimize <br />deterioration. <br />hl response to another question from Commissioner Reed, Mr. Brooks said that when the existing office <br />building is demolished, it would be done all at once because it's of steel -frame construction, which would <br />be without asbestos. <br />Planning consultant Richard Frisbee commended Senior Planner Barros on her comprehensive report. <br />Following up on Mr. Brooks' comment about the quality environment the project wants to create for <br />tenants, he pointed out that it's unusual to find six different floor plans in a relatively small project. Along <br />with the uniqueness of having variety in the units, he said, is the fact that most tenants will have direct <br />access from their garages to their living quarters; which is not only convenient but makes for a more <br />desirable place to live from a security standpoint. Other tenant - friendly features include laundry facilities <br />in each unit and ground -floor entrances to most of them so tenants don't have to climb stairs to get to their <br />front doors. <br />In terms of the site plan, Mr. Frisbee said that they've managed to achieve good density without cramming <br />the site, and he considers the plan better than the one they presented in January 2010. He credited the <br />Planning Commissioners' comments and the subsequent effort his team put into the design with turning it <br />into a very good project. <br />Speaking to concerns Planning Commissioners raised tonight, Mr. Frisbee said: <br />• The project team would give strong attention to ensuring noise control in terms of the units located <br />above garages of multiple tenants, and the architect would employ an acoustical engineer to help in this <br />regard. <br />• According to the project engineer, the onsite drainage would meet California Regional Water Quality <br />Control Board recommendations for the San Francisco Bay Region. <br />
The URL can be used to link to this page
Your browser does not support the video tag.