My WebLink
|
Help
|
About
|
Sign Out
Home
8M Consent 2011 1205
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2011
>
Packet 2011 1205
>
8M Consent 2011 1205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:23:18 PM
Creation date
11/29/2011 5:10:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
12/5/2011
Retention
PERM
Document Relationships
_CC Agenda 2011 1205
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2011\Packet 2011 1205
Reso 2011-202
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
Reso 2011-203
(Reference)
Path:
\City Clerk\City Council\Resolutions\2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: City of San Leandro <br />Meeting Date: December 5, 2011 <br />Staff Report <br />File Number: 11 -391 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.M. <br />TO: City Council <br />FROM: Lianne Marshall <br />Interim City Manager /Executive Director <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: Carla Rodriguez, Deputy Finance Director <br />TITLE: Staff Report for Rescinding Resolution No. 2011 -15, Award of Construction <br />Contract to Musco Excavation, Inc.; and Award of Construction Contract to <br />VEM General Engineering, Inc. for the 14901 East 14th Street Demolition <br />Project, Project No. 11- 962 -39 -001 <br />Staff Report for Rescinding Resolution No. 2011 -15, Award of Construction Contract to <br />Musco Excavation, Inc.; and Award of Construction Contract to VEM General Engineering, <br />Inc. for the 14901 East 14th Street Demolition Project, Project No. 11- 962 -39 -001 <br />RECOMMENDATIONS <br />Staff recommends rescinding the previously awarded contract to Musco Excavators, Inc. and <br />awarding of a contract to the second low bidder, VEM General Engineering, Inc. in the <br />amount of $48,000.00, for the subject project. The subject project will remove the existing <br />building and other structures as the first step in the site preparation for the intersection <br />improvement project. <br />�e1`el : "cr] 00] 011 <br />In 1997, the City identified the intersection of East 14th Street/ Hesperian Boulevard/ 150th <br />Avenue, known as "The Triangle ", as an area requiring improvement to reduce traffic <br />congestion and improve safety. In 2002, this project was approved as part of the Alameda <br />County Transportation Authority (ACTIA) Measure B 1/2 -cent tax reauthorization program. <br />The primary improvements will include: 1) widening East 14th Street at 150th Avenue to add <br />an additional eastbound left turn lane; 2) adding a dedicated southbound left turn lane on <br />Bancroft Avenue at East 14th Street; and 3) installing dual northbound left turn lanes on <br />Hesperian Boulevard at East 14th Street. <br />City of San Leandro Page 1 Printed on 1112912011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.