Laserfiche WebLink
PLN2009-00006; 2450 Washington Avenue October 2011 <br />Mitigated Negative Declaration <br />Mitigation Measure #18: Prior to issuance of a grading permit, the project applicant must <br />prepare and implement an erosion and sediment control plan (ESCP) including interim <br />and permanent erosion and sediment control measures and a pollutant control plan (PCP). <br />Mitigation Measure #19: Prior to issuance of a grading permit, the project applicant shall <br />file the required documentation to the State Water Resources Quality Board and prepare a <br />Storm Water Pollutant Prevention Plan (SWPPP) which will be reviewed and approved by <br />the City Engineer. The City Engineer must conduct inspections prior to issuing a <br />certificate of occupancy, to ensure that requirements are complied with. <br />Mitigation Measure #20: The applicant will comply with applicable waste discharge <br />requirements and municipal code requirements including preparation of a SWPPP for <br />construction activities and compliance with the Alameda Countywide Clean Water <br />Pro gr a m (ACCWP). These permit programs are designed to prevent violation of water <br />quality standards through mitigation and control of pollutant transport in storm water <br />runoff and infiltrating waters. The City of San Leandro Municipal Code ensures that <br />permit conditions are met. <br />Mitigation Measure # 21: Applicant shall be required to demonstrate adequacy of the <br />existing storm drain system to handle existing run -off from the drainage basin as well as <br />run -off from the project, upgrade the storm drain system to handle existing run -off from <br />the drainage basin as well as run -off from the project, or meter run -off from the site so that <br />it leaves the site at the same rate as it currently does. <br />Mitigation Measure #22: To reduce imperviousness, the applicant shall minimize use of <br />concrete walks and hardscape areas. Planters and landscape areas shall be maximized and <br />bioswales, paver blocks, decomposed granite and other alternative pavement materials will <br />be utilized to promote groundwater recharge. <br />Mitigation Measure #23: The applicant shall comply with the applicable City of San <br />Leandro Engineering and Building standards as part of the entitlement process to ensure <br />that new construction is designed to minimize the potential for damage from flooding. <br />Mitigation Measure #24: To meet Building Code DNL 45 dB requirements, it will be <br />necessary for some of the building facades to be sound rated, as indicated in Figure 2 of the <br />September 24, 2008 Acoustical Study prepared by Charles M. Salter Associates, Inc. STC <br />ratings for selected assemblies shall be based on laboratory testing performed in <br />accordance with ASTM E -90 and comprise the entire window or door assembly, including <br />the frame. If non - tested assemblies are to be used, an acoustical consultant must review the <br />glazing and frame submittals, and the STC rating of the glass may need to be increased. A <br />typical construction -grade 1 -inch insulated, dual -pane window achieves an STC rating of <br />approximately 28 to 30. <br />Mitigation Measure #25: The applicant shall incorporate lighting, landscaping and other <br />design features that reduce the potential for crime and facilitate rapid response to <br />emergency calls in accordance with General Plan Policy 45.06. <br />