Laserfiche WebLink
2450 WASHINGTON AVEP <br />DRAFT MITIGATION MONITORING AND <br />PLAN <br />IMPACT <br />MITIGATION MEASURES REQUIRED <br />1MOMTORING <br />RESPONSIBILITY <br />Noise <br />I2. The project will <br />Mitigation Measure #24: To meet Building Code DNL 45 dB <br />Development Director <br />Prior to issuance of <br />expose persons to or <br />requirements, it will be necessary for some of the building facades to be <br />and <br />Chie <br />Building Official <br />Building Permits and <br />generation of noise levels in <br />sound rated, as indicated in Figure 2 of the September 24, 2008 Acoustical <br />again prior to issuance <br />excess of standards <br />Study prepared by Charles M. Salter Associates, Inc. STC ratings for <br />of Occupancy Permits <br />established in the local <br />selected assemblies shall be based on laboratory testing performed in <br />general plan or noise <br />accordance with ASTM E -90 and comprise the entire window or door <br />ordinances, or applicable <br />assembly, including the frame. If non - tested assemblies are to be used, an <br />standards of other agencies. <br />acoustical consultant must review the glazing and frame submittals, and <br />the STC rating of the glass may need to be increased. A typical <br />construction -grade 1 -inch insulated, dual -pane window achieves an S'I'C <br />rating of approximately 28 to 30. <br />Public Services <br />lmmi <br />14 a to e. 1'he project will <br />Mitigation Measure #25: The applicant shall incorporate lighting, <br />C <br />Development <br />prior to issuance of <br />result in substantial physical <br />landscaping and other design features that reduce the potential for crime <br />D e ep <br />t <br />Building Permits <br />impacts associated with new <br />and facilitate rapid response to emergency calls in accordance with <br />or physically altered <br />General Flan policy 45.06. <br />governmental facilities, the <br />construction of which could <br />Mitigation Measure #26: The applicant shall pay all developer fees <br />cause significant <br />required by the San Leandro Unified School District school at the time of <br />SLUSD <br />'and <br />Community <br />Prior to issuance of <br />environmental impacts, in <br />building permits. <br />Develop <br />i <br />i ent Department <br />Building Permits <br />order to maintain acceptable <br />service ratios, response times <br />or other performance <br />Mitigation Measure #27: The applicant shall pay an impact fee and/or <br />objectives for any of the <br />dedicate parldand to offset the increase in park needs resulting from the <br />Comm <br />ty Development <br />public services. <br />proposed project. Where on -site parkland is dedicated, it should be <br />t <br />Prior to issuance of <br />improved, maintained, and accessible to the general public in accordance <br />Building Permits <br />with General Plan Policy 22.02. <br />