Laserfiche WebLink
2450 WASHINGTON AVENUE <br />DRAFT MITIGATION MONITORING AND REPaR III' PLAN <br />IMPACT <br />MITIGATION MEASURES REQUIRED <br />1MOPO�ORING <br />TINIINiG <br />1 <br />IESPONSMILITY <br />Recreation <br />I I I <br />I <br />15 a_ The ro'ect would <br />p 1 <br />(See Mitigation 27 above) <br />C <br />D <br />mm <br />l <br />i <br />Development <br />Prior to Issuance of <br />increase the use of existing <br />nt <br />BuiIding Permit <br />neighborhood and regional <br />parks or other recreational <br />7 i <br />facilities. <br />Utilities and Service Systems <br />1I <br />1 111 <br />17 a to g. The project will <br />Mitigation Measure #28: The applicant shall promote the efficient use of <br />Cil <br />E <br />III <br />eer <br />Prior to Issuance of <br />exceed wastewater treatment <br />existing water supplies through a variety of water conservation measures, <br />Building Permit <br />requirements of the <br />including evaluating the potential for the use of recycled water for <br />RWQCB, require <br />landscaping in accordance with Zoning Code, Article 19 and General Plan <br />construction of new water or <br />Policy 27.02. <br />wastewater facilities, storm <br />water drainage facilities and <br />result in a determination by <br />Mitigation Measure #29: The applicant shall conserve water through the <br />Chief <br />ding Official <br />Prior to Issuance of <br />the wastewater treatment <br />use of such measures as low -flow plumbing fixtures and water - saving <br />Building Permit <br />appliances in accordance with General Plan Policy 27.04. <br />provider which serves the <br />project that it has adequate <br />Mitigation Measure #30: The applicant shall be required to pay its fair <br />Ci <br />E <br />Prior to Issuance of <br />capacity. <br />share of the cost of improving the water, sewer, drainage and other <br />Building Permit <br />infrastructure systems needed to serve the development through the use <br />fees or other appropriate forms of mitigation in accordance with General <br />Plan Policy 52.02. <br />i <br />7 <br />