Laserfiche WebLink
Specific Mitigation Strategy <br />IN FIR - c, -Wildfire <br />CA Ensure a reliable source ofwater for fire <br />suppression (meeting acceptable standards for <br />minimum volume and duration of flow) for existing <br />and new development- <br />e-2 Develop a coordinated approach between Era <br />jurisdictions and water supply agencies to identify <br />needed improvements to the water distribution <br />system. initially focusing on areas of highest wildfir( <br />hazard (including wildfire threat areas and in <br />wildland- urban-interfa ce areas). <br />c-3 Devdop a defensible space vegetation program <br />that includes the clearing or thinning of (a) non -fiats <br />resistive vegetation within 30 feet of access and <br />evacuation roads and mutes to critical facilities, or <br />(b) all non-native species (such as eucalyptus and <br />pine, but not necessarily oaks? within 30 feet of <br />access and evacuation roads and mules to critical <br />facilities- <br />c-4 For new development. ensure all dead-end <br />segments of public roads in high hazard areas hav( <br />at least a -T- intersection turn - around sufficient for <br />typical wildland fire equipment- <br />C-6 For new development. enforce minimum road width <br />of 20 Net with an additional 1 0-fbot clearance on <br />each shoulder on all driveways and road segments <br />greater than 50 feet in length in wildfire hazard <br />areas. <br />C-6 Require that development in high fire hazard areas <br />provide adequate access roads (with width and <br />vertical clearance that meet the minimum standarch <br />of the Fire Code or relevant local ordnance), orsite <br />fire protection systems, evacuation signage, and fir <br />breaks. <br />c-7 Ensure adequate fire equipment road or fire mad <br />access to developed and coon soace areas- <br />IN FR - d- Flooding <br />d-1 Conduct a watershed analysis of run off and FL <br />drainage systems to predict areas of insufficient <br />capacity in the storm drain and natural crook <br />system. <br />d-2 Develop procedures for performing a watershed FL <br />analysis to examine the impact of development on <br />flooding potential downstream. including <br />communities outside ofthe jurisdiction of proposed <br />projects- <br />Infrastructure Mitigation Strategies <br />6 of 11 <br />& !Standard procedure <br />XX 9 <br />!Alameda County <br />XX <br />]Alameda County <br />& Standard procedure <br />,wing & !Standard procedure <br />�ortaticm 1 <br />Works I! Standard procedure <br />Alameda Cou <br />XX Flood Control <br />!Alameda County <br />XX I i <br />Flood Control <br />Responsible Agency <br />j Ordnance or Resolution 9 (if existing <br />E If <br />T — <br />0 <br />or Department <br />program ), Estimated Cost and <br />2 15 <br />0 <br />-91 6 -, <br />(Required if Existing <br />tossinxe Fuming Agency (if high <br />xi ri <br />m 0 <br />E <br />IR <br />W <br />Q I U <br />4 <br />Program, Existing <br />priority), Estimated Date of <br />cn vs <br />X '5 E Er M <br />m m <br />. -a <br />iE �a <br />E <br />2 <br />Program under <br />'75 funded. Very High, <br />Com pletion (if study). WHY if not <br />OR Other <br />o <br />same as regional priority, <br />A r. 9 <br />Hgh, or Under Study) <br />1 Comments <br />6 of 11 <br />& !Standard procedure <br />XX 9 <br />!Alameda County <br />XX <br />]Alameda County <br />& Standard procedure <br />,wing & !Standard procedure <br />�ortaticm 1 <br />Works I! Standard procedure <br />Alameda Cou <br />XX Flood Control <br />!Alameda County <br />XX I i <br />Flood Control <br />