Laserfiche WebLink
Infrastructure Mitigation Strategies <br />5 ofti <br />Z zResponsible <br />Agency <br />i Ordinance or Resolution # of existing <br />`o <br />or Department <br />program), Estimated Cost and <br />F 15 ° <br />(Required <br />(Required if Existing <br />Possible Funding Agency (if high <br />Specific Mitigation Strategy <br />ri a � � � � � � ,2 <br />m �? m <br />� Program. Existing <br />priority), Estimated Date of <br />6 2 <br />sir yr , 2 � <br />'i <br />Program under <br />;1, <br />Completion (if study). WHY if not <br />\ \\ <br />t3 >. a ri .� <br />o y; <br />funded. Very High, <br />same as. regional priority, OR Other <br />€iT <br />W Lu 3 � m F ° 2 €i <br />D Z 4 i3 <br />z {} 9h, or Cinder Study!; <br />Comments <br />b-4 <br />install spool £illy - engineered pipelines in areas <br />EQ <br />_ <br />lEn gineering and <br />.Ground conditions considered as <br />subject to faulting liquefaction- earthquake-induced <br />_ <br />ITransportation <br />partofdesignprocess.. Higher <br />landsliding, or other earthquake hazard. <br />1 <br />�ioriiy placed on large diameter, <br />higher Row pipelines or high risk <br />_ <br />!lines such as creek of freeway <br />1 = <br />'crossings. <br />b-5 <br />Replace or retrofit water - retention structures that <br />EQ <br />! EB 1tiD <br />are determined to be structurally deficient, including <br />levees. dams. reservoirs and tanks. <br />_ <br />b-& <br />Install portable fscili ies (such as hoses, pumps, <br />EQ <br />XX <br />lEBAA tiQ <br />emergency generators, or other equipmant) to allow <br />_ <br />pipalinasto bypass failu €e zones such as. tau It <br />rupture areas, areas of llquefacbon, and other <br />_ <br />ground failure areas (using a priority scheme if <br />funds are not available for installation at all needed <br />locations)_ <br />EQ <br />a. .... <br />XX <br />h-: <br />]natall earthquake-resistant connections when pipes <br />enter and exit bridges and work with bridge owners <br />to encourage retrofit of theses structures. <br />1 <br />EQ XX <br />Engineering & <br />Retrofitted or replaced buildings <br />trH <br />Compty with all applicable building and fro codes, <br />as well as other regulations (such as state <br />1 = <br />;Transportation and <br />!have been built to code <br />requirements for fault. Landsli& and liquefaction <br />_ - <br />!Community <br />investigations in particular mapped areas) when <br />_ _ <br />!Development <br />constructing or significantly remodeling <br />infrastructure facilities. <br />b-9 <br />Clarify to workers in critical facilities and emergency <br />ECG XX <br />!City Ravager <br />!This can be Incorporated into <br />personnel, as well as to elected officials and the <br />tutu re training- <br />public, the extent to which the facilities are expecte <br />to perform only at a life safety level. {allowing for the <br />1 <br />safe evacuation of personnel} or are expected to <br />remain functional following an earthquake. <br />EGF <br />s _ <br />,XX..._ <br />'Transit agencies <br />b-10 <br />Develop a water-based transportation ` system" <br />across the Say for use in the event of major <br />earthquakes. Implementation of such a system <br />could prove extremely useful in the event of <br />structural failure of either the road - bridge systems <br />or BART and might serve as an adjunct to existing <br />transportation system elements in the movement of <br />large numbers of people andfor goods. <br />5 ofti <br />