My WebLink
|
Help
|
About
|
Sign Out
Home
Airport Highlights 2012 0309
CityHall
>
City Clerk
>
City Council
>
Committees
>
Airport Committee
>
Airport Highlights 2012 0309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:51:28 AM
Creation date
4/10/2012 4:44:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
3/9/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0416 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0416
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />III. Acoustical Guidelines (Mestre-Greve) <br />A. STC Ratings - 35 <br />B. Acoustical Elements <br />C. Pre -Approved Acoustical Suppliers <br />Vinyl Windows - Milgard Windows or approved equal (VPI submittal under review) <br />Aluminum Windows — Graham, Peerless or Torrance Products <br />Wood Doors - Eggers Industries or approved equal (submittal under review) <br />Sliding Glass Doors — Graham, Peerless or Torrance (aluminum) or Milgard (vinyl) <br />Products or approved equal <br />D. Installation Performance (i.e. continuous caulking bead, compaction of insulation, etc) <br />E. Warehouse Inspection <br />IV. Architectural Guidelines (CDA) <br />A. Building Permits — Contractor to pay for permits. Contractor to pick up permits for each <br />home in Phase II. <br />B. Post -Bid Substitutions <br />C. Submittals (refer to Section 01331) -- 6 copies; 3 copies returned to Contractor; consist of <br />STC test reports, catalog sheets, certificates of compliance, material lists, manufacturer's <br />brochures, tech bulletins, specifications, diagrams, product samples or other requested <br />information. Samples and product data submittals shall be completed and submitted within <br />21 calendar days after receipt of Notice of Award from the City of San Leandro. <br />D. Building Codes — Performed in accordance with the building codes of San Leandro <br />E. RFIs RCOs Chane Orders <br />V. HazMat Guidelines (Forensic) <br />A. Egress Work — HazMat Containment <br />VI. Comments and Questions (team) <br />
The URL can be used to link to this page
Your browser does not support the video tag.