Laserfiche WebLink
Projects in Design <br />■ 2010 ADA Transition <br />• Modification of public -use areas at City facilities to bring them into <br />conformance with Americans with Disabilities Act (ADA) requirements for <br />accessibility <br />• Funding — CDBG <br />• Status— Preliminary design <br />Annual Street Sealing 2011-12 <br />• Street surface maintenance treatment chip, slurry, cape, or micro seal <br />• Funding — Measure B <br />• Status — Design <br />• Schedule —Start Construction Summer 2012 <br />■ BART -Downtown Pedestrian Improvements and Annual Overlay/Rehab 2011-12 <br />• Streetscape improvements along San Leandro Boulevard between Davis <br />Street and Williams Street <br />• Funding—Federal Grant, Gas tax <br />• Status —Design <br />• Schedule —Start Construction Fall 2012 <br />3/13/2012 <br />2 <br />