My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2012 0313
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2012 0313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:04:53 AM
Creation date
4/10/2012 4:46:13 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
3/13/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0416 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0416
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projects in Design <br />■ East 10 Street Undergrounding (1501h to Blossom) <br />• Relocate overhead utilities to UG and remove poles <br />• Funding—UG utility fees and PG&E Rule 20A <br />• Status—Design <br />• Schedule --Start Construction Winter 2012 <br />■ East 14th /Hesperian/150th intersection <br />• Widen roadway to accommodate traffic turning lanes <br />• Funding—Measure B <br />• Status —Design <br />• Schedule — Start Construction Summer 2016 <br />■ Hesperian / Springlake / Railroad Improvements <br />• Modify signal and sidewalk to improve pedestrian safety <br />• Funding—Grant (section 130) <br />• Status—Design <br />• Schedule — Start Construction Fall 2012 <br />Projects in Design <br />■ Marina Park Irrigation Improvements <br />• Replace irrigation system at Marina Park <br />• Funding— WW grant <br />• Status—Design <br />• Schedule — Start Construction Winter 2012 <br />■ Marina Park Picnic Area Improvements <br />• Replace/rebuild group picnic areas <br />• Funding— WW grant <br />• Status—Design <br />• Schedule — Start Construction Winter 2012 <br />■ Redundant Fiber Ring <br />• Add fiber optic cable on Washington from Springlake to Fargo to create a <br />redundant/alternate data path. <br />• Funding—DFSi <br />• Status - Design <br />• Schedule—Start Construction Summer 2012 <br />3/13/2012 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.