Laserfiche WebLink
Projects in Design <br />■ <br />Washington/ Monterey Traffic Signal Upgrade <br />• Modify existing signal to improve safety and capacity <br />• Funding—grant <br />• Status — Design <br />• Schedule — Start Construction Spring 2013 <br />Projects in Construction <br />■ 136th Ave / Bancroft Signal <br />• Install new traffic signal to improve pedestrian safety <br />• Funding —SR2S Grant <br />• Status —Construction <br />• Schedule — Begin work Summer 2012 <br />■ 14901 East 14th St Demo / Remediation <br />• Remove building and contamination from'triangle'to ready area for <br />street widening <br />• Funding—Measure B <br />• Status — Construction <br />• Schedule —Complete work Spring 2012 <br />■ ADA ramps 2011-12 <br />• Construct curb ramps at various locations <br />• Funding— CDBGand TDA <br />• Status — Construction <br />• Schedule —Complete work Summer 2012 <br />3/13/2012 <br />4 <br />