Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2013 PROPOSED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />Current Fee Reference <br />Pro osed Fee <br />Exp lanation of Propo Fee Chang for 2012 -13 <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division <br />2 <br />Building Permit (Continued) <br />(2) In- house- During Regular Working Hours <br />80% of the building permit fee <br />For Master Plans (i.e. identical buildings built by the same builder on the same lot <br />A full plan checking fee shall be paid for each <br />or in the same tract and for which building permits are issues at the same time): <br />Master Plan when more than one building will be <br />built and one half (50 %) of the full plan checking <br />fee shall be paid for each building at time of <br />aDDlication <br />Changes, revisions, or additions to plans previously checked. <br />Direct Cost(1) - 1 hour minimum charge <br />Outside plan checking services as utilized at discretion of Building Official. <br />Same as for In- house- During Regular Working Hours <br />Additional Plan Review after the first recheck <br />Direct Cost (1) - 1 hour minimum per occurrence <br />(3) In -house - Outside of Normal Business Hours When Requested by Applicant <br />Same as for In- house- During Regular Working <br />Hours PLUS overtime and overhead charges <br />(4) By Outside Consultant, When Requested by Applicant <br />Equal to In -house - During Regular Working <br />Hours PLUS Consultant's fee as established by <br />Agreement (contract) between City and <br />Consultant <br />(5) Over the Counter for Small Changes, Revisions or Additions, When Requested by <br />Direct Cost (1), with minimum of one -half hour <br />Applicant <br />(6) Expedited Plan Check when Requested by Applicant and when Plan Reviewer is <br />Full plan check fee plus one and one -half times <br />Available <br />Direct Cost (l <br />(7) Phased Plan check- when the foundation or another part of the building needs <br />One and One -half (1 -1/2) times the full plan <br />approval and permit issuance prior to the whole building <br />check fee for the entire buildin <br />(8) Alternate Methods and Materials <br />Direct cost (1) 1 hour minimum charge <br />(9) Energy Conservation for all buildings subject to the California Energy Commission's <br />20% of Building Permits <br />conservation re ulations <br />(10) California Health & Safety Code, section 18949.29 fee applied to all projects <br />5% of Building Permit Fee - For training and <br />requiring a "Building Permit ". <br />continuing education required by the California <br />Health and Safety Code section 18949. <br />3 Electrical Permit <br />A. Filing and Issuance <br />$88 plus the amount shown below for each <br />$90 plus... <br />ski'' . <br />electrical item <br />B. Plan- Check, when applicable Direct Cost (1) <br />For new Residential Construction and additions with valuations over $100,000 included all <br />13% of building permit fees <br />circuits service and sub panels. <br />- Circ uits: Installation, replacement or alteration of each electrical circuit (includes related outlets, switches, receptacle and lighting fixtures): <br />15 to 20 ampere circuit <br />$9.55 <br />$ <br />9.80 <br />I CPI <br />21 to 30 ampere circuit <br />$10.35 <br />$ <br />10.62 <br />I CPI <br />31 to 40 ampere circuit <br />$10.65 <br />$ <br />10.93 <br />ICPI <br />41 to 50 ampere circuit <br />$11.40 <br />$ <br />11.70 <br />I CPI <br />51 to 70 ampere circuit <br />$12.30 <br />$ <br />12.62 <br />CPI <br />71 to 100 ampere circuit <br />$15.50 <br />$ <br />15.90 <br />I CPI <br />101 to 200 ampere circuit <br />$22.45 <br />$ <br />23.03 <br />ICPI <br />Over 200 ampere capacity <br />$22.70 PLUS $6.80 for each additional 100 <br />$23.29 <br />CPI <br />ampere capacity or fraction thereof <br />PLUS$6.9_8... <br />I <br />Trolley and plug -in type bus -ways, per linear foot <br />$0.57 <br />$ <br />0 .58 <br />I CPI <br />Lighting fixtures, brackets, pendants, cord drops, outlets, receptacles, switches and other <br />$1.17 <br />$ <br />1.20 <br />I CPI <br />lames holding devices, e ach on existing circuits <br />Multi - outlet assemblies, Iighttracts, per linearfoot <br />$0.86 <br />$ <br />0.88 <br />ICPI <br />Temporary power service pole or pedestal, each <br />$27.70 <br />$ <br />28.42 <br />I CPI <br />Temporary distribution system (fo construction sites, Xmas tree lots, etc.), each <br />$27.70 <br />$ <br />28.42 <br />ICPI <br />Service or Service Change: <br />_ <br />I <br />Servi over 600 volts: <br />Up to 200 amp, each <br />$97.85 <br />$ <br />100.39 <br />I CPI <br />Over 200 amp, each <br />$97.85 <br />$ <br />100.39 <br />ICPI <br />Servi 600 volts or less, each <br />I <br />Up to 200 amp capacity -_ <br />$33.65 <br />$ <br />34.52 <br />ICPI <br />Over 200 amp capacity <br />$67.50 <br />$ <br />69.26 <br />ICP1 <br />Service disconnecting means for additional meter <br />$5.17 up to a maximum of $78.40 each <br />$5.30... <br />CPI <br />�(,�Direct <br />$80.44 each <br />Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />