Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 6, Chapter 4 <br />FINANCE <br />FISCAL YEAR 2013 PROPOSED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />)MMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division <br />same and generator: for each rated maximum of kW or kVA, and fraction thereof <br />1 to 20 <br />3 Electrical Permit (Continued) <br />21 to 50 <br />$54.20 <br />Fixed Residential Appliances (connection on new or existing circuits): <br />Electric range, dryer, combination washer and dryer, furnace, water heater, etc., each $10.15 <br />$ 1QQ1 <br />CP1' <br />Heaters (air, water and other kinds), furnaces and welding machines: For each DW Up to and including 20kW or kVA $21.30 <br />...$21.85 <br />CPI <br />or kVA and fraction of either. <br />21 to 50 <br />$52 <br />Over 20kW or kVA to and i ncluding 50kW or kVA $52.35 <br />CPI <br />... $53.71 1 <br />Over 50kW or kVA to and including 80 kW or kVA $83.85 <br />I ...$86.03 <br />ICPI <br />Ove 80kW or kVA $103.45 <br />...$ 106.14 <br />1CP1 <br />Fixed commercial appliances (connection on new or existing circuits) not exceeding 1 HP, <br />51 to 80 <br />$79. <br />kW or kVA: <br />$93. <br />For inspecti of alterations an d changes in existing wiring, each i nspection visit <br />Medical /dental equipment, food cabinets, showcases, laundry machines, motion picture $10.15 <br />I $ 10.41 <br />ICPI <br />machines, s pecialty lighting, etc.) <br />Photovoltaic- Commercial /Industrial0 to 8kw <br />$230.00 (includes 1 hr. structural plan check, 1 hr. <br />Fire protec systems, other than smoke detectors $14.65 <br />I $ 15.03 <br />ICPI <br />Smo detectors $4.35 <br />1 $ 4.46 <br />ICPI <br />Motors, including starting and controlling apparatus therefore and wiring between same and motor: <br />$650.00 (includes 4 hrs. structural plan check, 1 <br />Up to and including 1 h.p. $4.25 <br />Is 4.36 <br />ICPI <br />1.1 h.p. to 10 h.p. $10.15 <br />Is 10.41 <br />I CPI <br />10.1 h. p. to 13 h. p. $32. <br />I $ 32.83 <br />I CPI <br />13.1 h. p. to 16 h. p. $39. <br />1 $ 40.07 <br />I CPI <br />16.1 h. p. to 19 h. p. $47.0 <br />I $ 48.22 <br />I CPI <br />19.1 h.p. to 22 h.p. $54.00 <br />Is 55.40 <br />I CPI <br />22.1 h.p. to 25 h.p. $61.25 <br />I $ 62.84 <br />I CPI <br />25.1 h.p. to 28 h.p. $68.65 <br />1 $ 70.43 <br />I CPI <br />28.1 h. p. to 31 h. p. $75.95 <br />I $ 77. 92 <br />I CPI <br />31.1 h. to 34 h.p. $83.65 <br />1 $ 85.82 <br />I CPI <br />Above 34.h.p. $84.10 <br />I $ 86. 29 <br />ICPI <br />For changes, renewals or replacement of said apparatus, where no changes in wiring are One -half (1/2) of the amount set forth above <br />I <br />1 <br />'Generators, including switchboard and controlling apparatus theretore and wiring between <br />same and generator: for each rated maximum of kW or kVA, and fraction thereof <br />1 to 20 <br />$20.95 <br />21 to 50 <br />$54.20 <br />51 a nd above <br />$84.10 <br />Transformers and balance coils, when not embodied in or included with apparatus for <br />which fee is herein specifically prescribed: rated for each rated kVA and fraction thereof <br />1 to 20 <br />$20.95 ow <br />21 to 50 <br />$52 <br />51 to 80 <br />$83 <br />81 and above <br />$97. <br />Rectifiers (mercury arc, vibrating and electrolytic): for each kW or kVA and fraction thereof <br />1 to 20 <br />$20. <br />21 to 50 <br />$52. <br />51 to 80 <br />$79. <br />81 and abo <br />$93. <br />For inspecti of alterations an d changes in existing wiring, each i nspection visit <br />$27. <br />Photovoltaic Fees do not include Issuing and Filing Fees, Automation fees, and other mandated fees <br />Photovolta Residential <br />$30.00 (includes over - the - counter plan c <br />Photovoltaic- Commercial /Industrial0 to 8kw <br />$230.00 (includes 1 hr. structural plan check, 1 hr. <br />electrical plan check, and 1 inverter) _ <br />Photovoltaic- Commercial /Industrial >8 to 48kw <br />$320.00 (includes 1- 1 /2hr. structural plan check, <br />1 hr. electrica plan check, and 1 inverter <br />Photovoltaic- Commercial /Industrial >48kw <br />$650.00 (includes 4 hrs. structural plan check, 1 <br />hr. electrical plan check, and 1 inverter) <br />Each 0 - 8k P.V. Inverter over 1 <br />$20.00 <br />Each >8 - 48kw P.V. Inverter over 1 <br />"7 <br />$50.00 <br />Each >48kw P.V. Inverter over 1 <br />$80.00 <br />Energy Conservation: review of plans and /or energy forms for all buildings subject to the <br />Direct Cost (1) with a minimum charge of $58.80 <br />California Energy Commission's conservation regulations (when not covered by building <br />permit) _ <br />(1) Direct Cos hourly personnel charge plus a factor of 100% for fringe benefi overhe and indirect costs <br />21.49 <br />86.29 <br />$ 21.49 <br />$ 53.45 <br />$ 85.82 <br />$ 100.39 <br />$ 21.49 <br />$ 53.40 <br />$ 81.77 <br />$ 95.73 <br />$ 27.86 <br />$236.00 <br />$328.00 <br />$667.00 <br />$ 21.00 <br />$ 51.00 <br />$ 82.00 <br />$60.33 <br />