My WebLink
|
Help
|
About
|
Sign Out
Home
Finance Highlights 2012 0406
CityHall
>
City Clerk
>
City Council
>
Committees
>
Finance Committee
>
Finance Highlights 2012 0406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2012 3:35:49 PM
Creation date
5/1/2012 3:34:06 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
4/6/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0507 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0507
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN LEANDRO ADMINISTRATIVE CODE <br />TITLE 6, Chapter 4 <br />FINANCE <br />FISCAL YEAR 2013 PROPOSED FEES <br />§6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />'COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division <br />4 Plumbina Permit <br />A. Filing and Issuance Fee $88.20 plus the amount shown below for each <br />B. Plan Check, when applicable Direct Cost (1) <br />Exemption: Inspection of the installation of an eart hquake gas s hutoff valve $28.40 With No Filing & Issuance Fee <br />For new Residential Construction and additions with valuations over $100,000 including 16% of building permit fee <br />all water piping, gas piping, water heating and plumbing fixtur <br />Plumbing fixture or waste discharge, each <br />$10. <br />$ <br />11.18 <br />Plumbing fixture removed and opening sealed, each <br />$6.2 <br />I $ <br />6.41 <br />Plumbing fixture reset or set after the completion of the structure to an outlet roughed in <br />$8.15 <br />I $ <br />8.36 <br />prior thereto, each <br />Repair or alteration of drainage or vent piping, each <br />$12. <br />I $ <br />_ <br />12.88 <br />Inside rain leader, each <br />$8.1 <br />$ <br />8.36 <br />Dishwasher- r esidential, each <br />$8.15_ <br />I $ <br />8.36 <br />Dishw - commercial, each <br />$12. <br />$ <br />12.36 <br />Garbage disposal - residential, each <br />$8.1 <br />I $ <br />8.36 <br />Garbage disposal- commercial, each <br />$11. <br />Is <br />11.95 <br />Grease interceptor, each, up to 150 gal. <br />$8.15 <br />I $ <br />8.36 <br />Grease interceptor, each, over 150 gal. <br />$19.57 <br />$ <br />20.08 <br />Industrial waste interceptor (sand, grease, oil /water separator, neutralizer and clarifier) <br />$25.75 <br />$ <br />26.42 <br />installation or removal, each <br />Sewage ejector pump- residential, each <br />$17. <br />$ <br />17.85 <br />Sewage ejector pump- commercial, each <br />$27. <br />I $ <br />28.37 <br />W ater Piping: <br />Water line and first 10 openings (including water using equipment connected thereto) <br />$12.55 <br />I $ <br />12.88 <br />Each additional opening <br />$1.70 <br />$ <br />1.74 <br />Installation, replacement or abandonment of water service, each <br />$12.55 <br />I$ <br />12.88 <br />Irrigation sprinkler system and first 20 heads <br />$25. <br />$ <br />26.42 <br />Each additional head <br />$0.57 <br />Is <br />0.58 <br />Inspection of Irrigation Controllers installed in sprinkler systems <br />$5.10 <br />I $ <br />5.23 <br />Installation, alteration or repair of water piping and /or water treating or using <br />$12.55 <br />$ <br />12.88 <br />equipment, each _ <br />Submeters Inspection $10.15 <br />Water Heaters (gas or electric): <br />Under 90 gallons, each <br />Over 90 gallons, each <br />T & P valve, each <br />Flue <br />Minimum (one or two flues) <br />Each flue o ver two (ea ch) <br />Vacuum Breakers or Back -flow Devices: <br />Four or less <br />Each additional <br />Swimming Pools: <br />Private, each <br />Public, each <br />In- ground spas, hottubs and portable hottubs <br />Sewers and Storm Drains: <br />Storm drain or building sewer per 100 feet or fraction thereof <br />Building court connection to main sew lateral, each <br />Building rainwater drain systems, com plete, each <br />Septi tank outfit complete ( installation or removal /abandonment), each <br />Sewer extension, each <br />sewer <br />new or repairs or abandonment <br />Temporary privy or vault (chemical toilet), each <br />Gray Water Systems (fee to cover review of plans and inspection of the installed <br />_ system) _ <br />Direct Cost = hourly personnel charqe plus a factor of 100% for frinqe benefits, <br />$36. <br />$73.5 <br />N/C <br />$10.15 <br />$6.25 <br />$10.15 <br />$2.80 <br />$76.45 <br />$127 <br />$76.45 <br />$19. <br />$28.7 <br />$36.85 <br />$57.75 <br />$19.60 <br />$36.8 <br />$16. <br />$133.85 <br />overhead and indirect costs <br />mbinq item <br />Is 10.41 <br />I $ 37.81 <br />I $ 75.41 <br />I <br />Is 10.41 <br />Is 6.41 <br />Is 10.41 <br />Is 2.87 <br />I <br />I $ 78.44 <br />I $ 130.46 <br />I 78.44 <br />20.11 CPI <br />29.50 I CPI <br />37.81 I CPI <br />59.25 I CPI <br />20.11 I CPI <br />37.81 I CPI <br />17.24 I CPI <br />137.33 I CPI <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.