City of San Leandro <br />Meeting Date: May 7, 2012 <br />Staff Report <br />File Number: 12 -105 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.K. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for Resolution Accepting the Work for the Toyon Park Restroom <br />Sitework, Project 10- 210 -62 -008 <br />:7x��]JiIJiI��IILAIC906i <br />Staff recommends acceptance of the work, filing of the Notice of Completion, and authorizing <br />the City Manager to release the maintenance bond for the subject project upon successful <br />completion of the one -year maintenance period. <br />BACKGROUND <br />The original park restroom, constructed circa 1962, did not comply with Americans with <br />Disabilities Act (ADA) requirements and, after nearly 50 years of service, required significant <br />efforts each year to maintain it. Additionally, the original architecture created blind spots that <br />were perceived by some as unsafe. <br />The site preparation for the replacement facility and demolition of the old structure was done <br />under this contract. A pre- fabricated building was purchased and installed under a separate <br />contract. <br />Analysis <br />Construction is now complete and was performed in compliance with the contract documents. <br />The work included all necessary site preparation for placement of the pre- fabricated restroom <br />building. Such preparations included: 1) preparation of the new building sub - grade; 2) <br />relocation of utility connections; 3) installation of a new accessible parking stall; 4) installation <br />of a new drinking fountain; and 5) other miscellaneous site work. <br />Previous Actions <br />City of San Leandro Page 1 Printed on 51112012 <br />