My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2012-005
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2012
>
Ord 2012-005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 5:23:32 PM
Creation date
5/10/2012 3:01:44 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
5/7/2012
Retention
PERM
Document Relationships
8C Consent 2012 0507
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0507
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A: Proposed Amendments City of San Leandro Zoning Code - Article 19 <br />supply, <br />4. Flow rate (gallons per minute), application rate (inches per hour), and <br />design operating pressure (pressure per square inch) for each station; <br />5. Recycled water irrigation systems (if applicable); <br />6. Demonstration of compliance with all design standards specified in the <br />article; <br />7. The following statement: "I have complied with the criteria of Article 19 <br />of the Zoning Code, including all design standards and applied them <br />accordingly for the efficient use of water in the irrigation design plan "; <br />and <br />8. The signature of a licensed landscape architect, certified irrigation <br />designer, licensed landscape contractor, or any other person authorized <br />to design an irrigation system. <br />D. Certificate of Completion. Upon approval of the Landscape Documentation <br />Package, the applicant shall receive a Certificate of Completion, which shall <br />include the following: <br />1. Project Information Sheet; <br />2. certification that project has been installed in conformance with the <br />approved Landscape Documentation Plan; <br />3. irrigation scheduling parameters used to set the controller(s); <br />4. an audit report (if required); and <br />5. a landscape and irrigation maintenance schedule. <br />E. Changes to Approved Plans No significant or substantive changes to <br />approved landscaping or irrigation plans or any plans In the Landscape <br />Documentation Package shall be made without prior written approval by the <br />Zoning Enforcement Official. The Zoning Enforcement Official may refer <br />substantial changes to the Site Development Sub - Commission and may <br />require the approval of the project's decision - making body, such as Board <br />of Zoning Adjustment or Planning Commission, if the requested changes <br />would have a major effect on the character of the project, would effect a <br />landscape requirement that was discussed in the public hearing, or were <br />part of a condition of approval. <br />F. Irrigation Audits The City of San Leandro shall administer programs that <br />may include, but are not be limited to, irrigation water use analysis, <br />irrigation audits, and irrigation surveys for compliance with the Maximum <br />Applied Water Allowance. All landscape irrigation audits shall be <br />conducted by a certified landscape irrigation auditor. For new construction <br />and rehabilitated landscape projects installed after January 1, 2010 the <br />project applicant shall submit an irrigation audit report with the Certificate <br />AR.19 <br />Page 7 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.