My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2002-085
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2002
>
Reso 2002-085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2012 4:11:43 PM
Creation date
5/18/2012 4:11:43 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
6/17/2002
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Resolution No. 2002 <br /> • Attachment A <br /> Page 3 of 3 <br /> Re: Submittal of Request to the Metropolitan Transportation Commission for the Re- allocation of <br /> Fiscal Year 1999 -2000 and 2001 -2002 TDA Article 3 Pedestrian /Bicycle Project Funds to <br /> Claimants in the County of Alameda. <br /> Prioritized List of Projects <br /> TDA Article 3 Total Project <br /> Short Title Description of Project Amount Cost <br /> 1. Request for change in scope for some of the 1999 -2000 532,931 532,931 <br /> allocation. Installation of a Class III Bike Route along Merced <br /> Street between Williams Street and Wicks Boulevard, installation <br /> of a Class 11 Bike Lane along Wicks Boulevard between Merced <br /> Street and Farallon Street, and a Class I Bike Path along the <br /> Alameda County Flood Control Channel between Neptune Drive <br /> and Farnsworth Street, and installation of handicap ramps. <br /> (Original allocation of $47,931. Amount requested is $15,000 <br /> Tess than the original allocation - 515,000 already spent on <br /> handicap ramps and reimbursed) <br /> 2. Request for change in scope for some of the 2001 -2002 517,625 $17,625 <br /> allocation. Installation of a Class 11 Bike Lane along Lewelling <br /> Boulevard between Sedgeman Street and Washington Avenue and <br /> a Class II[ Bike Route between Washington Avenue and <br /> Hesperian Boulevard, installation of bicycle improvements along <br /> Marina Boulevard and Neptune Drive and installation of handicap <br /> ramps. <br /> (Original allocation 572,625. Amount requested is $55,000 less <br /> than the original allocation - $15,000 for handicap ramps already <br /> encumbered and 540,000 for bike lanes along Marina Boulevard <br /> and Neptune Drive already encumbered) <br /> Totals $50,556 $50,556 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.