My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2012 0618
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0618
>
8G Consent 2012 0618
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2012 8:32:54 AM
Creation date
6/12/2012 4:51:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/18/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0618 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0618
Reso 2012-069
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Meeting Date: June 18, 2012 <br />Staff Report <br />File Number: 12 -222 Agenda Section: CONSENT CALENDAR <br />Agenda Number: 8.G. <br />TO: City Council <br />FROM: Chris Zapata <br />City Manager <br />BY: Uchenna Udemezue <br />Engineering & Transportation Director <br />FINANCE REVIEW: David Baum <br />Finance Director <br />TITLE: Staff Report for a Resolution Accepting the Work for the Americans with <br />Disabilities Act (ADA) Ramp Project 2011 -12, Project No. 2012.0140 <br />C7 Elsie] JiIJiI;10IIli <br />Staff recommends accepting the work, filing the Notice of Completion, and upon completion to <br />the satisfaction of the Engineering and Transportation Director of the one -year maintenance <br />period, authorizing the City Manager to release the Maintenance Bond for the subject project. <br />Tits] <br />oil] I �7 <br />In 1995, the City completed an ADA Transition Plan (Plan) that describes the work required to <br />bring the City into compliance with national ADA requirements. The Plan states that the City <br />will install sidewalk wheelchair ramps at intersections whenever repair is made to the adjacent <br />street or sidewalk. <br />This CDBG- funded project installed ramps from the Priority One list. Priority One ramps are <br />defined as ramps that should have been upgraded to current ADA standards when a <br />significant street repair project was performed adjacent to them during or after 1995 but had <br />not been. <br />Approximately 239 ramps on the Priority One list have been installed using CDBG funds to <br />date. CDBG funding was used to construct an additional 17 ramps as part of this project. An <br />additional 10 ramps and 3 pork chop islands were upgraded to meet current standards at <br />locations requested by residents and were funded using Transportation Development Act <br />(TDA) and Measure B grant funds. <br />Analysis <br />Construction began on January 3, 2012. The work has been inspected and found to be <br />City of San Leandro Page 1 Printed on 611212012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.