My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2012 0613
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2012 0613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 6:15:26 PM
Creation date
6/26/2012 5:57:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
6/13/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0702 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0702
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Project Upda - i u ne 2012 Facilities Committee <br />I #ern f]escr #p #ion <br />Funding Status Schedule <br />1 2010 ADA Transition CD BG Preliminary Start Construction <br />Modification of public -use areas at City facilities to bring <br />them into confofmance with America ns with Disabl I I ties Act <br />(ADA) requirements for accessibility <br />2 Accessible Pedestrian Signal Upgrades 2012 <br />Add ADA compliant pedestrian feedback equipment to 13 <br />existi ng traffic signals_ <br />design Spring 2013 <br />Freedom Grant Preliminary <br />design <br />3 MRT�Ocwrntown Pedestrian Improvements and Annual Federal Grant Design Start Construction <br />Qveday /Rehab 2411 -12 Gas tax Fall 2012 <br />StreetsCape Improvements along San Leandro Boulevard <br />between Davis Street and Williams Street <br />4 Bridge Maintenance and Repair Measure B Design Start Construction <br />Repair concrete and seal bridge surface, San Leandro Blvd Fall 2013 <br />at Creek and Wicks Blvd near Stenzel Park <br />5 East 14th /Hesperia nflSMIntersection Measure Design StartConstru #ion <br />Widen roadway to accommodate traffic turning lanes Summer 2016 <br />6 East 14th Street Undergrounding (150th to Blossom) U utlIity fees Design Start Conskruction <br />Relocate overhead utilities to LrG and remove poles and PG &E Rule Spring 2013 <br />20A <br />2 Hesperia n /Springlake /RailroadImprevemenb Modify Grant section Design Start Construction <br />signal and sidewalk to improve pedestrian safety 130) early 20 13 <br />8 Martina Park Irrigation Improvements <br />Replace Irrigation <br />W grant <br />Design Start Construction <br />Winter 2012 <br />Design StartCpnstruction <br />Winter 2012 <br />system at Ma6na Park <br />9 Marl na Park Picnic Area Trnprove <br />group picnic areas <br />Replace/rebuild <br />10 Monarch fiat' Bridge Maintenance and Repair Repair <br />concrete and seal deck of bridge located south of Marina <br />Park <br />VVW grant <br />Highwaygridge Design Start Construction <br />Program Grant Fait 2013 <br />and McBSUFe B <br />Page 1 of 2 bold text represents new data <br />
The URL can be used to link to this page
Your browser does not support the video tag.