My WebLink
|
Help
|
About
|
Sign Out
Home
FacilitiesTransportation Highlights 2012 0613
CityHall
>
City Clerk
>
City Council
>
Committees
>
Facilities & Transportation Committee
>
FacilitiesTransportation Highlights 2012 0613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 6:15:26 PM
Creation date
6/26/2012 5:57:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Committee Highlights
Document Date (6)
6/13/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0702 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0702
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Project Update -June 2012 facilities ComrnMee <br />item Description <br />Funding Status Schedule <br />11 Washington /Manterey Traffic SIgnalUpgrade Grant Deslga Start Construct+on <br />modify existing sign al to improve safety and capacity Spring 2013 <br />12 Annual Street Sealing 2011 -12 Measure B Out to bid Start Construction <br />Street surface maintenance treatment chip, slurry, cape, or Summer 2012 <br />micro seal <br />13 Redundant Fiber Ring DFSI Out to bid Start Co nstructio n <br />Add fiber optic cable on Washington from Springlake to Summer 2012 <br />Fargo to create a redundant/alternate data path. <br />14 Annual Sidewalk Program 2011 -12 Measure 8 construction Complete summer <br />Replace tfamaged portions of existing sidewalk, install ADA 2012 <br />curb ramps. <br />10 136th Ave J Bancroft Signal SR2S Grant Construcfon Finish Aug 24D1Z <br />Install new traffic signal to improve p @d2Stri8n Safety <br />15 Estudillo Callan Garage RDA Construction Complete work Fa CI <br />Replace existing garage with larger stronger structure 2012 <br />17 Street tight Underground Ing E. 14th 150th to South Chy UG utility complete Scheduled for <br />Limit account nceptance 7/16/12 <br />install new street lights with underground utility <br />connections <br />18 WPCP Rehabilitation <br />Fkeplace warn facilities remove bottlenecks et water <br />pollution control plant <br />SS enterprise Construction <br />fund <br />Complete work 2014 <br />19 ADA ramps ZO11 -12 <br />Construct Curb ramps 8t various locations <br />CORG and TOA Complete <br />Schedultd for <br />ecceptance 6119/12 <br />Page 2 of 2 bald text Wiese nts r7ew data <br />
The URL can be used to link to this page
Your browser does not support the video tag.