Laserfiche WebLink
Capital Project Update -June 2012 facilities ComrnMee <br />item Description <br />Funding Status Schedule <br />11 Washington /Manterey Traffic SIgnalUpgrade Grant Deslga Start Construct+on <br />modify existing sign al to improve safety and capacity Spring 2013 <br />12 Annual Street Sealing 2011 -12 Measure B Out to bid Start Construction <br />Street surface maintenance treatment chip, slurry, cape, or Summer 2012 <br />micro seal <br />13 Redundant Fiber Ring DFSI Out to bid Start Co nstructio n <br />Add fiber optic cable on Washington from Springlake to Summer 2012 <br />Fargo to create a redundant/alternate data path. <br />14 Annual Sidewalk Program 2011 -12 Measure 8 construction Complete summer <br />Replace tfamaged portions of existing sidewalk, install ADA 2012 <br />curb ramps. <br />10 136th Ave J Bancroft Signal SR2S Grant Construcfon Finish Aug 24D1Z <br />Install new traffic signal to improve p @d2Stri8n Safety <br />15 Estudillo Callan Garage RDA Construction Complete work Fa CI <br />Replace existing garage with larger stronger structure 2012 <br />17 Street tight Underground Ing E. 14th 150th to South Chy UG utility complete Scheduled for <br />Limit account nceptance 7/16/12 <br />install new street lights with underground utility <br />connections <br />18 WPCP Rehabilitation <br />Fkeplace warn facilities remove bottlenecks et water <br />pollution control plant <br />SS enterprise Construction <br />fund <br />Complete work 2014 <br />19 ADA ramps ZO11 -12 <br />Construct Curb ramps 8t various locations <br />CORG and TOA Complete <br />Schedultd for <br />ecceptance 6119/12 <br />Page 2 of 2 bald text Wiese nts r7ew data <br />