My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent 2012 0716
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2012
>
Packet 2012 0716
>
8K Consent 2012 0716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2012 4:14:27 PM
Creation date
7/11/2012 11:39:16 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
7/16/2012
Retention
PERM
Document Relationships
_CC Agenda 2012 0716 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2012\Packet 2012 0716
Reso 2012-088
(Reference)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Number: 12 -347 <br />Including the design cost of $82,078.27 and construction administration cost of $40,779.44, <br />the total project cost was $304,571.01. Change order work included the addition of <br />vandal- resistant pull box covers to protect the underground electrical cables. <br />Budget Authority <br />$50,000.00 from the Underground Utility fund was allocated to Account No. 210 -38 -172 via <br />the City budget for fiscal year 2006 -07. An additional $300,000.00 was allocated from the <br />same fund in the 2007 -08 City budget. The project funds in Account No. 210 -38 -172 were <br />transferred to Account No. 123 -38 -172 in fiscal year 2011 -12. <br />PREPARED BY: Kyle K. Lei, Associate Engineer, Engineering and Transportation <br />Department <br />City of San Leandro Page 3 Printed on 711012012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.