Laserfiche WebLink
W WI LLDAN <br />Financial 'Services <br />For Fiscal Year 2012/13 a monitoring report will be prepared by a consultant and funded <br />by the District. <br />C. District Reserve Fund <br />A Maintenance Reserve Fund is maintained by the District in the amount of $300,000 <br />to fund capital improvements and unexpected or emergency repairs. There have not <br />been any withdrawals from the reserve fund this past fiscal year and none are <br />anticipated for the coming fiscal year. <br />D. Capital Improvement Projects <br />Levee Maintenance 2014/15 <br />The nature of the levees that protect the Heron Bay marshland is such that they require <br />periodic maintenance; specifically, the heavy stone rip rap that prevents erosion shifts, <br />settles, or washes away and needs to be replaced. This work is most efficiently done by <br />an outside contractor in large quantities. In fiscal year 2009 -10 the Heron Bay Levee <br />Maintenance account was established. Provided that there are funds available, the <br />District will contribute to the account each year. When sufficient funds have accumulated <br />City staff, working on behalf of the District, will obtain permits and bids for the work and <br />then contract for construction of the work. Any unused funds will be returned to the <br />District. <br />Construction work on the levees is tentatively scheduled for fiscal year 2013 -14. The <br />District contributed $100,000 to the Heron Bay Levee Maintenance account in fiscal year <br />2009 -10. The District also contributed an additional $150,000 in fiscal year 2011 -12. An <br />additional contribution of $50,000 will be made to Heron Bay Levee Maintenance <br />account in Fiscal Years 2012 -13 and 2013 -14, respectively. <br />Paving Work at Marshland Maintenance Access Driveway <br />To control the tracking of mud from the Marshland by maintenance vehicles exiting onto <br />Baypoint Drive, limited paving work was performed on the maintenance access driveway <br />in early 2012. <br />New pavement work extending the current limit of the completed work to desired limits <br />will be performed, as part of upcoming City's Annual Street Rehabilitation Project. <br />Because of the size of the project, staff thinks that the most economical way to construct <br />the project is to make it a part of a larger project, such as City's Annual Street <br />Rehabilitation Project. <br />Entryway Landscape and Kiosk Signage Rehabilitation <br />The landscape at the entrance to the development along Lewelling Blvd, between Wicks <br />Blvd and the roundabout will be scheduled for rehabilitation /replacement in Fiscal Year <br />2012 -13, as part of the overall improvement to the Entryway to Heron Bay District, as <br />well as the entryway sign. Staff will work with Stopwaste.org to investigate the possibility <br />of receiving grant funds to offset portions of the landscape upgrade, with the intent of <br />utilizing Bay Friendly Landscape Guidelines. <br />City of San Leandro Heron Bay Maintenance Assessment District No. 96 -3 Page 5 <br />