My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2012 Construction Testing Services Inc
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2012
>
Agmt 2012 Construction Testing Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2012 2:56:49 PM
Creation date
11/26/2012 2:56:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
11/19/2012
Retention
PERM
Document Relationships
Reso 2012-119
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`\ CONSTRUCTION 16emo <br /> ecteeMINO <br /> TESTING SERVICES M MONO <br /> BASIS OF CHARGES <br /> GENERAL <br /> Fees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services other than <br /> supervisory will be charged at applcable rates. Soils testing with nuclear gauge and/or sand cone equipment may require applicable <br /> travel and mieage charges for equipment transport and storage per code. Fees for special projects. services overseas, or elsewhere in <br /> the United States, wil be quoted on request. My yearly increase in hourly lees shall be tied to the Oakland/San Francisco/Oakland/San <br /> .lose cost of Irving index for the 12 months ending in October, not 10 exceed 1.5 %. The CPI index to use is at the following Ink: <br /> http://wvewabaoca.gov/planninghesearch/cpintrn1 <br /> MINIMUM HOURLY CHARGES - INSPECTION <br /> Technician personnel and the Iofowing minimum charges are contractual commitment: <br /> One-half day or less 4 Hours <br /> Over one-hall day 8 Hours <br /> Show-up time gess than 2 hours notice = 4 hour charge) 2 Hours <br /> WORKING HOURS AND PREMIUM TIME <br /> Regular workday is the fest 8 hours between 6:00 am and 600 pm Monday through Friday. PrernNm tine is as follows. <br /> Overtime, Weekdays and Saturdays (fast 8 hours) 1.5 x quoted hourly rate <br /> Overtime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rale <br /> Overtime Sundays (over 8 hours) and Holidays 3 x quoted hourly rate <br /> Shift differential. swing and graveyard - <br /> (Work performed between 2:00 pm and 4:01) am) 12.556/hour 088810na! to base or quoted rate. <br /> MISCELLANEOUS CHARGES - Only Where Appaeable <br /> Facsimile charges. Plus 1.00/page (Mc for cover page) 55.00 minimum <br /> Parking Fees At Cos <br /> Air Travel Cod Plus 5% <br /> Outside Services Cod Plus 20% <br /> Subsistence (per union contract) 585.00/day <br /> Mileage outside of Northern California (50 mile radius of Pleasanton) Standard Federal Rate <br /> Project Management 8 Administration 5% of MontNy Invoice <br /> Samples Made by Others: Concrete Cylinders 5100 • Tes <br /> Samples Made by Others: AI Other Tests 540 • Ted <br /> Returned Check Fee 5100 <br /> TESTS <br /> Testing fees shown indude normal tine fa porlmnn9 test. Samples requiting special preparation will be charged at the laboratory <br /> ldnidan rate. Fees for tests not ided will be quoted upon request. Thera will be a minimum charge of 5100.00 for any en9inec^9 <br /> report. Please note some tests maybe tested by subcoisulards. <br /> CONCRETE AND MASONRY TESTS <br /> Standard Discounted <br /> PORTLAND CEMENT CONCRETE Rat a/Each Ram/Hour <br /> Compression led. 6' x 1T Cinder (including mold) ASTM C -39 510.00 <br /> Cylinder molds. 6' x 12 ASTM C -470 540.00 <br /> Cylinders stared and arced. not tested (nduding mold) 540.00 <br /> Compression lest. Gone (including sample prep) 555.00 <br /> Compression lest. Cores ASTM C -42 580.00 <br /> Lightweight insulating concrete. 3' x 6' cylinders ASTM C -495 <br /> Compression led. i,dudin9 mold 560,00 <br /> Unit Weight test, inducting mold 560,00 <br /> Flexural led, Cr x 6' x 18' ASTM C -78 5200.00 <br /> Splitting tensile lest. 6' x 17 o tinder ASTM C -495 5150.00 <br /> Unit Weight, concrete cysnder 55000 <br /> Modulus of dadioty (static) ASTM C -489 5210.00 <br /> Laboratory trial batch (mixing and molding only) ASTM C -192 5480,00 <br /> Crying shrinkage (3 specimens - 28 days, including prep) ASTM C -157 Mod 5370.00 <br /> Unit Weight - fireproofing. each ASTM E -805 5100.00 <br /> Sample pickup NO CHARGE <br /> High Strength Concrete - Mix Designs/that batches/and other considerations OOR <br /> Compression tests (over 8000 p.s.i. or 400 k) each 5100.00 <br /> Grab sample. sealing end storing for 2 months in a humidly and <br /> temperature controlled room. 535.00 <br /> .4aftrr redid re edit efOmega <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and CTS, Inc. — Exhibit B Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.