Laserfiche WebLink
// CONSTRUCTION IEGING <br /> r�i 1 <br /> TESTING SERVICES IMMURING <br /> MASON RY <br /> Compression lest <br /> mortar 7 s 4' calinder, U.B.C. (inch/din mold) 520.00 <br /> mortar molds. 7 s 4 Single use 540.00 <br /> grout. U. B.C. 520.00 <br /> mortar or grout. dared and cured not tested (including mold) 520.00 <br /> non-shrink grout 520.00 <br /> 2'>< 7■2'cubes 550.00 <br /> cores (ndudng sample prep) 5100.00 <br /> composite grouted pram. each 5100.00 <br /> Shear test- bed joint - Preece method (including sample prep) 5170.00 <br /> Compression test. gross area only each ASTM C -140 585.00 <br /> Compression test. nel area and gross area each ASTM C -140 5105.00 <br /> Absorption. Moisture content and unit weight ASTM C -140 5105.00 <br /> L shrinkage CMA Rapid Method 5110.00 <br /> L Shrinkage heir , Method 5130.00 <br /> Tensile test CMA Method OOR <br /> Non - standard block (a1 tests) OOR <br /> • BRICK <br /> Modulus of rapture ASTM C -87 5100.00 <br /> Compression ASTM C487 S100.00 <br /> Saturation coefficient (indudng absorption) ASTM C -67 5100.00 <br /> Suction rate ASTM C -87 5100.00 <br /> Efflorescence ASTM C -67 5100.00 <br /> 'Unusual unpin p+epam1ar far acct erecirnn vA as droved at coo a abisha howdy We <br /> nuprs reehn is carte ! (Lore= <br /> te= <br /> Consulting Services Agreement between Project No. 08- 593 -52 -239 <br /> City of San Leandro and CTS, Inc.— Exhibit B Page 4 of 6 <br />