My WebLink
|
Help
|
About
|
Sign Out
Home
8G Consent 2013 0304
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0304
>
8G Consent 2013 0304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:33:12 PM
Creation date
2/27/2013 11:07:29 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
3/4/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0304 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0304
Reso 2013-026
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-059 <br />providing a vista onto the Paseo Del Oro, East 14th Street/Downtown and beyond. <br />Improvements to the Paseo Del Oro match the improvements recently completed on the <br />opposite, west side of East 14th Street. Stormwater runoff from the garage roof is collected <br />and conveyed to provide irrigation to a Plaza rain garden and meet clean water requirements. <br />An updated bus shelter structure is also provided. <br />Analysis <br />On August 25, 2010, Webcor Construction, LP, was awarded the construction contract. <br />Construction began on November 29, 2010. The completed work was inspected and found in <br />accordance with the project specifications and City standards. <br />There remains a small amount of corrective work to be completed by the contractor that will <br />not significantly impact use of the garage. To insure full completion of this corrective work , the <br />City will withhold funds in the amount of $36,000 equal to 150% of its value. Upon <br />completion, inspection and acceptance by the City Engineer, the funds held in retention will be <br />released to the prime contractor. The prime contractor concurs with the proposed approach . <br />LEED certification is in review with the U.S. Green Building Council. <br />Additional work on this project such as Solar Panels, Security Cameras and Parking Access <br />and Revenue Control System will be completed by other contractors under separate <br />contracts. <br />Current Agency Policies <br />·Work with the community and all stakeholders toward completing major projects and <br />programs for substantial economic growth <br />·Maintain and enhance the City’s infrastructure <br />Previous Actions <br />·On September 20, 2010, by Resolution No. 2010-125, the City Council approved a <br />cooperative agreement with the City of San Leandro Redevelopment Agency for the <br />purpose of undertaking redevelopment activities within the Plaza project area <br />·On September 20, 2010, by Resolution No. 2010-126, the City Council awarded <br />construction contract to Webcor Construction , LP for the subject project <br />Committee Review and Actions <br />On September 9, 2008, December 9, 2008, and May 12, 2009, the Facilities Committee <br />received updates on the status of the Estudillo Callan Parking Garage Project. <br />Applicable General Plan Policies <br />·6.01 Downtown Plan Implementation. In accordance with the adopted Downtown Plan <br />and Urban Design Guidelines, ensure that the new downtown is attractive and creates an <br />image conducive to economic revitalization <br />Page 2 City of San Leandro Printed on 2/26/2013
The URL can be used to link to this page
Your browser does not support the video tag.