Laserfiche WebLink
fe. <br />Potentially Significant Irhpact <br />Potentially Significant <br />. Unless Mitigation <br />Iheorporaied <br />Less than <br />Significant Impact No. Impact <br />b. Exceed, either individually or cumulatively, 4 level of service standard <br />established in the Growth Limitation Plan, the county congestion <br />management agency for designated roads or highways? <br />• • • X <br />e. Result in a change in air traffic patterns, including either an increase In <br />traffic levels or a change in location that results in substantial safety fisks? <br />(n/a) <br />• • • X <br />d. Substantially increase hazards due to a design feature (e.g., sharp curves <br />or danjgefous intersections) or incompatible Uses (e.g., farm equipment)? <br />(3,25) <br />• • X <br />e. Result in inadequate emergency access? • • • X <br />f. Result in inadequate parking capacity? • • • X <br />g. Conflict yyith adopted policies, plans, or programs supporting alternative <br />transportation (e.g., bus turnouts, bicycle racks)? <br />Comment a.-a.: The orooosed wihd turbine would not increase traffic, <br />change airtraffjc, increase hazards, impact emergency access, create <br />inadequate parking or conflict with adopted policies or plans. <br />:• • . G X <br />XVII. UTILITIES AND SERVICE SYSTEMS. <br />a. Exceed wastewater treatment requirements of the applicable Regional <br />Water Quality Control Board? • • • V n X <br />b; Require or result in the construction of new water or wastewater treatment <br />facilities or expansion of existing facilities, the construction of. which could <br />cause significant environmental effects? <br />• D • X <br />c. Require or result in the construction of new storm water drainage facilities <br />or expansion of existing facilities, the construction of which could cause <br />significant environmental effects? <br />• • n X <br />d. Have sufficient water supplies available to serve the project from existing <br />entitlements and resources, or are new or expanded entitlements needed? • • • X <br />e, Result in a determination bythe wastewater treatment provider which <br />serves or may serve the project that it has adequate capacity to serve the <br />projects projected demand in addition to. the provider's existing' <br />commitments? <br />• • • • x <br />f. Be served by a landfill with sufficient permitted capacity to accommodate <br />the project's solid waste disposal needs? • • • X <br />g. Comply with federal, state, and local statutes and regulations related to <br />solid waste? <br />Comment a.-a.: The proposed wind turbine would not exceed wastewater <br />treatment requirements, would hot require new water or wastewater <br />treatment facilities, require new storm drainage facilities or expansion of <br />facilities, require new water supplies, or exceed landfill requirements, The <br />wind turbine will comply with all federal, state and local statutes and <br />regulations related to solid waste. <br />• .• • X <br />i <br />5r <br />13 t <br />i-