My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2013087813
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2013
>
Inst 2013087813
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2013 2:42:05 PM
Creation date
4/5/2013 2:42:04 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
1/14/2013
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> C. Outdoor parking area lighting shall not employ a light source higher than twelve <br /> (12) feet and shall create no cone of direct illumination greater than sixty degrees <br /> (60°),from a light source higher than six (6) feet and shall not directly shine onto an <br /> adjacent street. <br /> III. FIRE DEPARTMENT <br /> A. The project shall comply with the applicable building and fire codes as adopted <br /> by the City of San Leandro. <br /> IV. ENGINEERING & TRANSPORTATION <br /> A. Pursuant to Government Code Section 66020, including Section 66020 (d) (1), the <br /> City HEREBY NOTIFIES the applicant for this Project that the 90-day approval <br /> period (in which the applicant may protest the imposition of any fees, dedications, <br /> reservations, or other exactions imposed on this Project by these Conditions of <br /> Approval) will begin on the date of the conditional approval of this Project. If you <br /> fail to file a protest within this 90-day period, complying with all of the <br /> requirements of Government Code Section 66020, you will be legally barred from <br /> later challenging any such fees, dedications, reservations or other exactions. <br /> B. The proposed development shall comply with City ordinances, policies and <br /> regulations. All improvements shall be in accordance with the City's Design <br /> Standards, Specifications and Standard Plans unless otherwise specifically <br /> approved by the City Engineer. <br /> C. The applicant shall pay design review fees, permit fees, inspection fees, (estimated <br /> to be about $2,000, $65 and $1,000,respectively) and any other fees charged by the <br /> City or other reviewing agencies for the review, approval,permitting and inspection <br /> of the public and/or private improvements. In addition, the applicant will be <br /> required to deposit a restoration fee, estimated to be about$5,232.90 for work in the <br /> public right of way related to driveway and sidewalk replacement. <br /> D. Prior to the issuance of building permits for the project, the applicant shall obtain an <br /> Encroachment Permit from the Engineering and Transportation Department for any <br /> work within the public right-of-way <br /> E. The applicant shall have site improvements designed and stamped by a civil <br /> engineer registered to practice within the State of California. The applicant shall <br /> obtain approval of the City Engineer for all on and off site improvements prior to <br /> the issuance of Building Permits for the project. <br /> F. All utilities under sidewalks shall have 24" of minimum cover and utilities under <br /> the street shall have 36" of minimum cover measured from the lowest lip of <br /> gutter. <br /> Agreement to Conditions January 14, 2013 <br /> PLN2012-00018 Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.