Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2014 Proposed FEES <br />Current Fee Reference Proposed Explanation of FY 2013-14 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />COMMUNITY DEVELOPMENT DEPARTMENT – Business Development <br />1 Owner Participation Agreements for Redevelopment Areas Direct Costs (1) <br />2 Development Agreements and Leases for City/Agency Owned Property Direct Costs (1) <br />3 Conditional Use (Redevelopment Agency)Direct Costs (1) <br />4 Appeals <br />A. Occupancy Approval Direct Costs (1) <br />B. Conditional use Direct Costs (1) <br />C. Signs Direct Costs (1) <br />D. Other Direct Costs (1) <br />5 Marina Leases <br />A. Extensions Direct Costs (2) plus the value of the extension. (3) <br />B. Assignments Direct Costs (2) plus the value of the assignment (3) <br />C. New Leases Direct Costs (2) <br />(1) Direct Costs: Hourly personnel charge plus a factor of 33% for benefits, 14.80% for indirect overhead charges and 52.23% for staff support charges. <br />(2) Direct Costs/Planning: Hourly personnel charge plus a factor of 33% for benefits, 83% for indirect overhead charges and 89% for staff support charges. <br />(3) Based on case-by-case financial analysis and appraisals of subject facilities/improvements. <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division <br />1 Plans and Specifications See Engineering & Transportation Department Item 7, Public Work Projects <br />2 Building Permit <br />A. Filing and Issuance Fee $90 plus valuation fees and/or other building fees as listed below $92.00 plus valuation fees and/or other building fees as listed below <br />Re-filing Fee for each resubmittal, deferred submittal, and/or revision after the 1st <br />resubmittal , or upon the 2nd resubmittal for plan check on the same project <br />50% of Filing and Issuance Fee per occurrence <br />Minimum fee for one inspection Included in the Issue and Filing Fee <br />Building Permits requiring more than one inspection, other than for those requiring <br />return inspections for corrections from a previous inspection, have a minimum fee of: <br />$137.00 140.00$ <br />All-Inclusive Permit: Work involving a combination of building and/or mechanical, <br />electrical and plumbing, with a value of less than $3,000: <br />One filing and issuance fee plus Items from <br />respective fee tables <br />Residential Seismic Retrofit projects using "Plan set A" (for one and two family <br />residences) <br />$77.00 plus Filing and Issuance Fee and other <br />miscellaneous fees <br /> 75.00$ Increased in error last year. <br />Reverted back to original fee. <br />Permits involving plan check, inspections, and verification per OSHPD3 <br />requirements. <br />125% of normal Building Permit Fee. Plan check <br />fee shall be calculated based on this increased <br />fee. <br /> <br />New Commercial/Industrial Buildings 10,000 sq. ft. or more (additional time for plan <br />review, inspections, and verification of code requirements) <br />125% of standard Building Permit Fee <br />Tier 1 Certification (additional time for plan review, inspections, and verification of <br />code requirements) <br />130% of standard Building Permit Fee <br />Tier 2 Certification (additional time for plan review, inspections, and verification of <br />code requirements) <br />135% of standard Building Permit Fee <br />From - To and Including <br />$1.00 - $4,000 $137.00 140.00$ <br />$4,001.00-$50,000.00 $137.00 for the first $4,000.00 plus $13.54 for <br />each additional $1,000 or fraction thereof, to and <br />including $50,000 <br /> <br />$50,001.00-$100,000.00 $759.00 for the first $50,000 plus $9.49 for each <br />additional $1,000 or fraction thereof, to and <br />including $100,000.00 <br /> <br />$100,001.00-$500,000.00 $1,233.00 for the first $100,000 plus $5.40 for <br />each additional $1,000 or fraction thereof, to and <br />including $500,000.00 <br /> <br />$500,001.00-$1,000,000.00 $3,397.00 for the first $500,000 plus $5.10 for <br />each additional $1,000 or fraction thereof, to and <br />including $1,000,000.00 <br /> <br />$1,000,001.00 and up $5,946.00 for the first $1,000,000 plus $4.26 for <br />each additional $1,000 or fraction thereof, to and <br />including $1,000,000.00 <br /> <br />B. Termite Repair Work $90.00 plus total valuation as listed above <br />$0.00 - $3,000 $137.00 140.00$ <br />Over $3,000 Same as for other building permits, minimum of <br />$137.00 <br /> <br />NOTE: FEES FOR BUILDING PERMITS AND TERMITE REPAIR WORK DO NOT INCLUDE THE STRONG MOTION (EARTHQUAKE) INSTRUMENTATION PROGRAM <br />(S.M.I.P.) FEE MANDATED BY THE STATE OF CALIFORNIA AND COLLECTED BY THE CITY FOR THE STATE. THIS FEE MUST BE ADDED TO THE PERMIT FEES. <br />$779.00 for the first $50,000 plus $9.75 for each additional <br />$1,000 or fraction thereof, to and including $100,000.00 <br />$3,486.00 for the first $500,000 plus $5.25 for each additional <br />$1,000 or fraction thereof, to and including $1,000,000.00 <br />$6,106.00 for the first $1,000,000 plus $4.40 for each additional <br />$1,000 or fraction thereof. <br />Total Valuation: (Based on total value of all construction work, as determined by the Building Official, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire- <br />extinguishing systems and any other permanent equipment.) <br />$140.00for the first $4,000.00 plus $13.90 for each additional <br />$1,000 or fraction thereof, to and including $50,000 <br />$1266.00 for the first $100,000 plus $5.55 for each additional <br />$1,000 or fraction thereof, to and including $500,000.00 <br />Same as for other building permits, minimum of $140.00 <br />(Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent with this fee schedule.) <br />G:\BUDGET\2013-14 and 2014-15\Fees\Draft 2014 Proposed Master Fee Schedule 3 4/24/2013