Laserfiche WebLink
SAN LEANDRO ADMINISTRATIVE CODE FINANCE <br />TITLE 6, Chapter 4 FISCAL YEAR 2014 Proposed FEES <br />Current Fee Reference Proposed Explanation of FY 2013-14 <br />§ 6.4.100: FEES. The following fees have been established by the City Council pursuant to various provisions of the San Leandro Municipal Code (SLMC), San Leandro Administrative Code (SLAC) or the general laws of the State of California. <br />Description <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />3 Electrical Permit (Continued) <br />Fixed Residential Appliances (connection on new or existing circuits): <br />Electric range, dryer, combination washer and dryer, furnace, water heater, etc., <br />each <br />$10.41 $ 10.60 <br />Heaters (air, water and other kinds), furnaces and welding machines: For each <br />DW or kVA and fraction of either. <br />Up to and including 20kW or kVA $21.85 Up to and including 20kW <br />or kVA $22.40 <br />Over 20kW or kVA to and including 50kW or kVA $53.71 Over 20kW or kVA to and including 50kW or kVA $55.15 <br />Over 50kW or kVA to and including 80 kW or kVA $86.03 Over 50kW or kVA to and including 80 kW or kVA $88.35 <br />Over 80kW or kVA $106.14 Over 80kW or kVA <br />$109.00 <br />Fixed commercial appliances (connection on new or existing circuits) not exceeding 1HP, kW or kVA: <br />Medical/dental equipment, food cabinets, show cases, laundry machines, motion picture <br />machines, specialty lighting, etc.) <br />$10.41 $ 10.70 <br />Fire protection systems, other than smoke detectors $15.03 $ 15.45 <br />Smoke detectors $4.46 $ 4.60 <br />Motors, including starting and controlling apparatus therefore and wiring between same and motor: <br />Up to and including 1 h.p.$4.36 $ 4.50 <br />1.1 h.p. to 10 h.p.$10.41 $ 10.70 <br />10.1 h.p. to 13 h.p.$32.83 $ 33.70 <br />13.1 h.p. to 16 h.p.$40.07 $ 41.15 <br />16.1 h.p. to 19 h.p.$48.22 $ 49.50 <br />19.1 h.p. to 22 h.p.$55.40 $ 56.90 <br />22.1 h.p. to 25 h.p.$62.84 $ 64.55 <br />25.1 h.p. to 28 h.p.$70.43 $ 72.30 <br />28.1 h.p. to 31 h.p.$77.92 $ 80.00 <br />31.1 h.p. to 34 h.p.$85.82 $ 88.10 <br />Above 34 h.p.$86.29 $ 88.60 <br />For changes, renewals or replacement of said apparatus, where no changes in wiring are <br />necessary <br />One-half (1/2) of the amount set forth above <br />For motor generator sets, balancer sets, dynamotors and converters, including control <br />apparatus <br />150% of fees set forth above, with a maximum <br />for one such machine of $84.15 <br />Generators, including switchboard and controlling apparatus therefore and wiring between same and generator for each rated maximum of kW or kVA, and fraction thereof: <br />1 to 20 $21.49 $ 22.10 <br />21 to 50 $55.61 $ 57.10 <br />51 and above $86.29 $ 87.00 <br />Transformers and balance coils, when not embodied in or included with apparatus for which fee is herein specifically prescribed rated for each rated kVA and fraction thereof: <br />1 to 20 $21.49 $ 22.10 <br />21 to 50 $53.45 $ 57.10 <br />51 to 80 $85.82 $ 87.00 <br />81 and above $100.39 $ 100.00 <br />Rectifiers (mercury arc, vibrating and electrolytic) for each kW or kVA and fraction thereof: <br />1 to 20 $21.49 $ 22.10 <br />21 to 50 $53.40 $ 57.10 <br />51 to 80 $81.77 $ 87.00 <br />81 and above $95.73 $ 100.00 <br />For inspection of alterations and changes in existing wiring, each inspection visit $27.86 $ 30.00 <br />Photovoltaic Fees do not include Issuing and Filing Fees, Automation fees, and other mandated fees <br />Photovoltaic - Residential $30.00 (includes over-the-counter plan check) <br />Photovoltaic - Commercial/Industrial 0 to 8kw $236.00 (includes 1hr. structural plan check, 1 <br />hr. electrical plan check, and 1 inverter) <br />Photovoltaic - Commercial/Industrial >8 to 48kw $328.00 (includes 1-1/2hr. structural plan check, <br />1 hr. electrical plan check, and 1 inverter ) <br />Photovoltaic - Commercial/Industrial >48kw $667.00 (includes 4 hrs. structural plan check, 1 <br />hr. electrical plan check, and 1 inverter) <br />Each 0 - 8kw P.V. Inverter over 1 $21.00 22.00$ <br />Each >8 - 48kw P.V. Inverter over 1 $51.00 52.00$ <br />Each >48kw P.V. Inverter over 1 $82.00 84.00$ <br />Energy Conservation: review of plans and/or energy forms for all buildings subject to the <br />California Energy Commission’s conservation regulations (when not covered by building <br />permit) <br />Direct Cost (1) with a minimum charge of $60.33 Direct Cost (1) with a minimum charge of $62.00 <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />$250.00 (includes 1hr. structural plan check, 1 hr. electrical <br />plan check, and 1 inverter) <br />$350.00 (includes 1-1/2hr. structural plan check, 1 hr. electrical <br />plan check, and 1 inverter ) <br />$700.00 (includes 4 hrs. structural plan check, 1 hr. electrical <br />plan check, and 1 inverter) <br />$60.00 (includes over-the-counter plan check, 1 inverter, 1 <br />disconnect, and circuit connection to main panel) <br />G:\BUDGET\2013-14 and 2014-15\Fees\Draft 2014 Proposed Master Fee Schedule 5 4/24/2013