My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2013 0520
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0520
>
8F Consent 2013 0520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:52:37 AM
Creation date
5/15/2013 2:09:55 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0520 RGAmended2
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0520
Reso 2013-061
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
Supplement 8F Consent 2013 0520
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0520
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
C ITY OF S AN L EANDRO <br />S AN L EANDRO S HORELINE D EVELOPMENT P ROJECT EIR <br />EXHIBIT A: WORK SCOPE AND COSTS <br /> <br />THE PLANNING CENTER | DC&E 24 <br />MAY 1, 2013 <br /> <br />hours of staff labor for completion of the Draft Response to Comments. If additional time is <br />needed due to an unforeseen volume of comments, we may request contract modification to <br />cover additional labor costs. First and second drafts, consisting of two electronic copies (1 <br />each in Word and PDF formats will be submitted to City staff for review. <br /> <br /> <br />Task H. Final EIR with Response to Comments <br />Following receipt of one consolidated set of City comments on the second Draft Response to <br />Comments, an Administrative Final EIR will be prepared. This will include both the Response <br />to Comments document, additional analysis or revisions to the Draft EIR as necessary, and <br />the Mitigation Monitoring and Reporting Program. The Planning Center | DC&E will submit <br />two electronic copies (1 each in Word and PDF formats). <br /> <br />Following receipt of comments on the Administrative Draft Final EIR, The Planning <br />Center | DC&E will prepare the Final EIR for publication. We will submit 25 CDs (PDF <br />format), 25 hard copies, 2 electronic copies (1 each in Word and PDF formats) of the <br />document. <br /> <br />The Planning Center | DC&E will attend up to two certification hearing on the Final EIR. <br /> <br /> <br />Task I. Mitigation Monitoring and Reporting Program <br />A MMRP will be assembled by The Planning Center | DC&E team working in close <br />collaboration with the City, to ensure that procedures are put in place so that the EIR <br />mitigation measures are carried out in an appropriate, timely, and verifiable manner. The <br />MMRP will be submitted as a draft document to the City and revised for publication with the <br />Final EIR. <br /> <br /> <br />Task J. Findings and Statement of Overriding Considerations <br />The Planning Center | DC&E will prepare draft and final findings and statement of overriding <br />considerations for use by the City during the EIR certification hearings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.