My WebLink
|
Help
|
About
|
Sign Out
Home
8I Consent 2013 0603
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2013
>
Packet 2013 0603
>
8I Consent 2013 0603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2013 5:25:30 PM
Creation date
5/29/2013 3:06:54 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Staff Report
Document Date (6)
6/3/2013
Retention
PERM
Document Relationships
_CC Agenda 2013 0603 CS+RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2013\Packet 2013 0603
Reso 2013-077
(Reference)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 13-244 <br />of the site work construction contract with Calstate Construction is listed below: <br />Calstate Construction Original Contract: $719,500 <br />Change Orders: $64,000 <br />Total Contract Amount: $783,500 <br />Major change orders involved the following: increased concrete slab thickness, deepened <br />storm drain inlet, shade fabric revision, and sandblasted seat wall finish. <br />Budget Authority <br />The project was funded using Measure WW grant funds provided by the East Bay Regional <br />Park District, appropriated in CIP Account No . 150-62-107 and approved by City Council as <br />part of the 2010-2011 City budget. <br />PREPARED BY: Mark Goralka, Associate Engineer, Engineering and Transportation <br />Department <br />Page 3 City of San Leandro Printed on 5/29/2013
The URL can be used to link to this page
Your browser does not support the video tag.