My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2013 The Planning Center DC&E
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2013
>
Agmt 2013 The Planning Center DC&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:06:35 AM
Creation date
5/30/2013 11:06:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
Reso 2013-061
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br /> SAN LEANDRO SHORELINE DEVELOPMENT PROJECT EIR <br /> EXHIBIT A: WORK SCOPE AND COSTS <br /> 31. Davis Street(SR-112)&1-880 Northbound ramps <br /> (1) 20,21,and 25 are future signalized intersections intersection <br /> (2) 5,26,27,28,29,and 30 are existing non-signalized intersections <br /> The scope of work and cost estimate assume that 31 intersections will be analyzed. The final <br /> list of analysis intersections will be prepared using a screening analysis and input from the <br /> City. Based on the preliminary Project trip generation and distribution, KAI will conduct a <br /> screening analysis. All intersections in the Project vicinity that would be affected by at least <br /> 50 new peak hour trips will be considered for more detailed analysis. If the final list of <br /> analysis intersections exceeds 31,a budget adjustment may be required. <br /> 1. PROJECT INITIATION <br /> KAI will review available documents and data from City and attend a kick-off meeting with <br /> City staff to refine the proposed scope of work. As part of this task, KAI will also determine <br /> and refine the specific tasks to be completed as part of the site planning effort versus the EIR <br /> effort. Based on the preliminary traffic assignments and in consultation with City staff, KAI <br /> will select any the additional study intersections for analysis. <br /> 2. DATA COLLECTION <br /> 1. The City has already compiled existing counts for 23 intersections. Therefore KAI will <br /> conduct counts for the remaining study locations,as follows: <br /> 28. Monarch Bay Drive&Mulford Point Drive <br /> 29. Monarch Bay Drive&Pescador Point Drive <br /> 30. Monarch Bay Drive&Fairway Drive <br /> The following intersections were not counted by City due to active construction at the Kaiser <br /> Medical site. These locations will not be counted by KAI as they represent new intersections <br /> and to the extent possible will instead rely on historical counts or traffic model forecasts: <br /> 13. Republic Avenue&Merced Street <br /> 16. Fairway Drive&Miller Street <br /> 24. Fairway Drive&Kaiser West Driveway <br /> 25. Marina Boulevard&Kaiser North-South Access Road <br /> THE PLANNING CENTER I DC&E 5 <br /> MAY 1,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.