My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2013 The Planning Center DC&E
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2013
>
Agmt 2013 The Planning Center DC&E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 11:06:35 AM
Creation date
5/30/2013 11:06:33 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/20/2013
Retention
PERM
Document Relationships
Reso 2013-061
(Approved by)
Path:
\City Clerk\City Council\Resolutions\2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br /> SAN LEANDRO SHORELINE DEVELOPMENT PROJECT EIR <br /> EXHIBIT A: WORK SCOPE AND COSTS <br /> Task C Environmental Review <br /> The Planning Center I DC&E will prepare an EIR that focuses on CEQA resource categories <br /> where substantial evidence of a potentially significant environmental impact exists, while <br /> scoping out environmental issues on which it can be seen with certainty that the project <br /> would have no significant negative impact on the basis of existing documentation and <br /> regulation. <br /> In keeping with the requirements of CEQA, environmental review of the San Leandro <br /> Shoreline Development Project will include a detailed analysis to determine the <br /> environmental impacts for the following resource categories: <br /> 1. AESTHETICS <br /> The Planning Center I DC&E will analyze potential adverse impacts on scenic vistas and <br /> shading from the proposed project. The Planning Center I DC&E Urban Design staff will <br /> prepare up 6 visual simulation/massing studies at key locations within the project area,with <br /> the specific locations determined through consultation with City staff. For each viewpoint, <br /> The Planning Center I DC&E will show existing conditions and future conditions,showing the <br /> proposed building typology and height. We will include sufficient architectural detail in the <br /> simulations to represent the building concept; however, due to cost considerations,we will <br /> not depict detailed design elevations. Shading studies will be conducted at each of the <br /> viewpoints, depicting sun angles at each seasonal equinox. Light and glare impacts will be <br /> discussed on a qualitative basis,since there is no detailed lighting plan in place. <br /> The Planning Center I DC&E will evaluate consistency with the goals and policies of the <br /> Historic Preservation and Community Design Chapter of the General Plan as part of the <br /> aesthetic review analysis. <br /> 2. AIR QUALITY AND GREENHOUSE GASES <br /> The Planning Center I DC&E will conduct a Criteria Air Pollutant Emissions Analysis and <br /> Community Health Risk Assessment (HRA)to evaluate proposed air quality impacts of the <br /> proposed project. The analyses will be prepared in accordance with the BAAQMD CEQA Air <br /> Quality Guidelines.' To ensure streamlined CEQA review for subsequent projects, the <br /> While adoption of the thresholds was set aside until an environmental evaluation is <br /> conducted pursuant to a recent court ruling,the BAAQMD's significance criteria, as outlined in their <br /> CEQA Guidelines,are supported by extensive studies and analysis. <br /> THE PLANNING CENTER I DC&E 11 <br /> MAY 1,2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.